Abstract
In this paper, we introduce the 1st performance evaluation of VLBI Correlation Subsystem (VCS) main product, which is core system of Korea-Japan Joint VLBI Correlator (KJJVC). The main goal of the 1st performance evaluation of VCS main product is that the perfection of overall system will be enhanced after checking the unsolved part by performing the experiments towards various test items at the manufacturer before installation of field. The functional test was performed by including the overflow problem occurred in the FFT re-quantization module due to the insufficient of effective bit at the VCS trial product in this performance test of VCS main product. Through the performance test for VCS main product in the factory, the problem such as FFT re-quantization discovered at performance test of VCS trial product in 2008 was clearly solved and the important functions such as delay tracking, daly compensation, and frequency bining were added in this VCS main product. We also confirmed that the predicted correlation results (fringe) was obtained in the correlation test by using real astronomical observed data(wideband/narrow band).
본 논문에서는 한일공동VLBI상관기(Korea-Japan Joint VLBI Correlator, KJJVC)의 핵심 구성시스템인 VLBI상관서브 시스템(VLBI Correlation Subsystem, VCS) 본제품의 1차 성능시험에 대해 기술한다. VCS 본제품의 1차 성능시험의 주요 목적은 현장에 설치하기 전에 제작사에서 다양한 시험항목을 대상으로 시험을 수행하여 문제점을 확인 후 전체 시스템의 완성도를 높이는 것이다. 이번 성능시험에서는 VCS 시작품에서 발견된 FFT 재양자화의 유효비트 부족으로 인한 오버폴로어 문제점을 포함한 기능적인 시험을 수행하였다. 이번 VCS 본제품의 공장시험을 통하여 2008년 VCS 시작품의 성능시험에서 발견한 FFT 의 재양자화 문제점이 완전히 해결되었으며 VCS 본제품에 지연추적, 지연보상, 주파수 묶음 등의 중요 기능도 추가되었다. 그리고 실제 관측 데이터(광대역/협대역)를 이용한 상관처리 시험에서도 예측되는 상관결과가 출력되는 것을 확인하였다.