References
- Alder, R. "UDOT Construction Manager General Contract (CMGC) Annual Report," Utah Department of Transportation Project Development Group, Engineering Services and Bridge Design Section, Salt Lake City Utah, 2007, pp.4-39.
- Bearup, W, Kenig, M., and O'Donnell, J. "Alternative Delivery Methods, a Primer", Proceedings, Airport Board Members and Commissioners Annual Conference, Airports Council International - North America, Chicago, IL.2007, pp. 78-82
- Construction Management Association of America (CMAA), "Construction Delivery Approaches," 2007, http://www2.mvr.usace.army.mil/WaterControl/Districts/MVR/ SAME/construction/ConstructionDeliveryApproaches.pdf [May 21, 2009]
- Department of Energy (DOE), Cost Estimating Guide DOE G 430.1-1, Department of Energy, Washington, DC, 1997, p.11.1.
- Doren, D., M. Bridgers, and M. Napier, " FMI/CMAA Sixth Annual Survey of Owners," Construction Management Association of America, 2005, http://cmaanet.org/user_images/owners_survey_6.pdf 2005 [ November 16, 2008]
- General Accounting Office (GAO) Using Structured Interviewing Techniques, GAO/PEMD-10.1.5, General Accounting Office, Washington, D.C., 1991, 191pp.
- Grand County, Colorado, "CM/GC Fee Structure Sample", Grand County, Colorado, 2007, pp. 1-3. http://co.grand.co.us/GM-GC/Fees_&_Agreements_Updated_ 4-6- 07/CMGC_Sample_Fee_Structure_Grand_County.pdf [May 19 2009].
- Gransberg, D.D., and J.S. Shane. Construction Manager-at-Risk Project Delivery for Highway Programs, National Cooperative Highway Research Programs (NCHRP) Synthesis Report 402, Washington, D.C, 2009, 139pp.
- Harbuck, R.H. "Using Models in Parametric Estimating for Transportation Projects" 2002 AACE International Transactions, Portland, Oregon, 2002, pp. EST 05.1-05.9.
- Kwak,Y.H. and R. Bushey, "Construction Management at Risk: An Innovative Project Delivery Method at Stormwater Treatment Area in the Everglades, Florida," Proceedings, Construction Congress VI Orlando, Florida, 2000, pp. 477-482.
- Ladino, M.J., K.A. Reedy, and J.E. Carlson, "Alternate Project Delivery in Horizontal Construction," Presentation, Annual Meeting Associated General Contractors of America, Las Vegas, Nevada, 2008, 25pp.
- Martinez, P.H., Y Rashida. And V. MacMurray. "Construction Manager's Responsibilities: Pre-Design, Design and Pre-Construction Phase" American Bar Association, 2007, 58pp.
- Minchin, E., K. Thakkar, K., and R.Ellis, "Miami Intermodal Center-Introducing CM-At-Risk to Transportation Construction", in Innovative Project Delivery Systems, ASCE Press, 2007, pp 46-59.
- Neuendorf, K.A. The Content Analysis Guidebook, Sage Publications, Thousand Oaks, California, 2002 300 pp.
- Ripley, P.W. "Contingency! Who Owns and Manages It?" 2004 AACE International Transactions, Washington, DC, 2004, pp.CSC.08.1-CSC.08.4.
- Spata, S. and Kutilek, F.A. "Solutions to Managing Construction Cost Escalation Tools, Strategies, and "Selective Scoping" Help Manage Risk," Tradeline, Inc., 2006, http://www.tradelineinc.com/reports/B045DC52-2B3B-B525- 8F91436EBCDCEA9B [May 20, 2009].
- Storm, G. "New Contracting Experience Guides Fairbanks Airport Project," Pacific Builder and Engineer 2007, http://www.acppubs.com/article/CA6480230.html?industryid=4 8546 [September 22, 2008]
- Strang, W., "The Risk in CM at-Risk," CM eJournal, Construction Management Association of America, 2002, p. 1-9.
- Touran, A. "Owners Risk Reduction Techniques Using a CM," CMAA Research Report, Construction Management Association of America, Washington, DC, 2006, 55pp.
- Touran, A., D.D. Gransberg, K.R. Molenaar, K. Ghavamifar, D.J. Mason, and L.A. Fithian. A Guidebook for the Evaluation of Project Delivery Methods, TCRP Report 131, Transportation Research Board, National Academies, Washington, D.C., 2009, 240pp.
- Trauner Consulting Services,"Innovative Procurement Practices Alternative Procurement and Contracting Methods," California Department of Transportation Report No. 53A0104, Sacramento, California, 2007, p. 10-12
- US Army Corps of Engineers (USACE). Engineering Instructions Construction Cost Estimates, CEMP-E/CECW-EEI 01D010, US ACE, Washington, D.C., 1997, p.121.
- Van Winkle, H. "Alternate Project Delivery Systems," Proceedings, 2007 ACI Annual Conference, Airports Council International, Kansas City, Missouri, 2007, p. 7-41.
- Whitten, M. "Cardinal Change," Construction Law Section Seminar Workbook, The Commercial Bar Association, April 22, 2004, http://new.vicbar.com.au/pdf/CLE_Seminar22042004.pdf, [May 21, 2009], pp. 1-14.
- Yin, R. K., Case Study Research: Design and Methods, Sage Publications Beverly Hills, California, 1994, 289pp.
Cited by
- Stochastic Conceptual Cost Estimating of Highway Projects to Communicate Uncertainty Using Bootstrap Sampling vol.3, pp.3, 2017, https://doi.org/10.1061/AJRUA6.0000895
- Critical Comparison of Progressive Design-Build and Construction Manager/General Contractor Project Delivery Methods pp.2169-4052, 2019, https://doi.org/10.1177/0361198118822315