References
- Kang SM, Kim OJ, Domestic and Foreign Present Situation Analysis of a PC Method, Daelim Technology Research Institute, 2006
- Park CL, Kim MH, Chung IY, An Experimental Study on the Structural Properties of Beam-Column Joint Using Half Precast Beam, Journal of Construction Engineering and Management, 1994;10(3):117-125.
- Lim JH, Lee KM, Moon JH, Lee WH, Kim SY, Lee KC, Structural Capacity Evaluation of Precast Concrete Joints used for Underground Parking System, Journal of the Architectural Institute of Korea,2008;10(2):265-274.
- Yoo DH, Lee HB, Ahn JC, Kang BH, A Study on the Economical Analysis of the Composite Precast Concreate Method, Journal of Construction Engineering and Management, 2007:113-118.
- Hyun KM, Choi IW, Kim OK, Development of the form-work system for quality improvement on the kick-up of wall in the apartment house construction, Journal of the Architectural Institute of Korea, 2005;21(4):173-178.
- Kim SH, Choi JH, Kim SK, Lee DH, Improvement Plan for Connecting Form of PC Member -Focused on Apartment Buildings-, Journal of the Korea Institute of Building Construction, 2010;10(1):9-12.
- An SH, Lee UK, Kang KI, A Study on the Proposal about the Improvement of PC in Construction Industry, Journal of the Architectural Institute of Korea, 2004;20(7):133-140.
- Yang SW, Cho HH, Kang KI, Development and Application of Unit Table Form using Euro Form for High-rise Building Construction, Journal of the Korea Institute of Building Construction, 2008;8(2):45-53. https://doi.org/10.5345/JKIC.2008.8.2.045
- Kim TH, Kim OJ, Kim GH, Lee DB, An Analysis of Rapid Construction and Productivity of Formwork System by Using Aluminum Panel Form System with Dropping Beam, Journal of the Architectural Institute of Korea, 2008;28(1):523-526.
- Elazouni AM, Ali AE, Abdel-Razek RH, Estimating the Acceptability of New Formwork Systems Using Neural Networks, Journal of Construction Engineering and Management, 2005;131(1):33-41. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(33)
- Hanna AS, Willenbrock JH, Sanvido VE, Knowledge acquisition and development for formwork selection system, Journal of Construction Engineering and Management, 1992;118(1):179-198. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(179)
- Jeong BJ, Hong KP, Ha SW, The Flexural Behaviour of Reinforsed Concrete Beams with Precast Lighr Weight Concrete Formwork, Journal of the Architectural Institute of Korea, 2009;25(5):95-102.
- Son JH, Seok HS, Lee SH, Park JW, Simulation Analysis of Productivity and Economic Efficiency of the PC and Steel Structures According to the Beam-Column Connection Type, Journal of the Architectural Institute of Korea, 2009;25(7):137-144.
- EL DEBS MK, Montedor LC, DE HANAI JB, Compression tests of cement-composite bearing pads for precast concrete connections, Cement & concrete composites, 2006:28(7);621-629. https://doi.org/10.1016/j.cemconcomp.2006.05.005
- Kim TH, Lee HM, Kim YJ, Shin HM, Performance assessment of precast concrete segmental bridge columns with a shear resistant connecting structure shear resistant connecting structure, Engineering Structures, 2010. https://doi.org/10.1016/j.engstruct.2010.01.007
- Ahn YS, Lee LH, Survey and Analysis on the Work Process and Working Time Characteristics of Formwork Operation, Journal of the Architectural Institute of Korea, 1993;9(3):191-196.
Cited by
- An Analysis of the CO2 Reduction Effect of a Column-Beam Structure Using Composite Precast Concrete Members vol.21, pp.1, 2012, https://doi.org/10.1177/1420326X11423162