References
- 김종상, "공급사슬경영의 유효성 입증을 위한 최적화 생산 시스템의 시뮬레이션," 한국컴퓨터정보학회논문지, v.6, no.1, 2001.3
- A. Atighenhchain and M. Bijari, and H. Tarkesh, "A novel hybrid algorithm for scheduling steel-making continuous casting production," Computers & Operations Research, Volume 36(8), pp.2450-2461, 2009 https://doi.org/10.1016/j.cor.2008.10.010
- C. Rajendran and H. Ziegler, "Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flow shop with sequence-dependant setup times," European Journal of Operational Research, Volume 149(3), pp.513-522, 2003 https://doi.org/10.1016/S0377-2217(02)00485-X
- C. N. Redwine and D. A. Wismer, "A mixed integer programming model for scheduling order in a steel mill," Journal of Optimization Theory and Applications, Volume 14(3), pp.305-318, 1974 https://doi.org/10.1007/BF00932613
- D. Yao and F. Pei, "Flexible parts routing in manufacturing systems," IIE Transportations Volume 22(1), pp. 48 - 55, 1990 https://doi.org/10.1080/07408179008964157
- G. N. Ebbe, "Local search algorithm for the multiprocessor flow shop scheduling problem," European Journal of Operational Research, Volume 128(1), pp.147-158, 2001 https://doi.org/10.1016/S0377-2217(99)00354-9
- J. Du and J. Y. T. Leung, "Minimizing total tardiness on one machine is NP-hard," Mathematics of Operations Research, Volume 15(3), pp. 483–495, 1990 https://doi.org/10.1287/moor.15.3.483
- L. X. Tang, J. Y. Liu, and Z. H. Yang, "A mathematical programming model for scheduling steelmaking-continuous casting production," European Journal of Operational Research, Volume 120(2), pp. 423-435, 2000 https://doi.org/10.1016/S0377-2217(99)00041-7
- L. X. Tang, P. B. Luh, J. Y. Liu, and L. Fang, "Steel-making process scheduling using lagrangian relaxation," International Journal of Production Research, Volume 40(1), pp. 55-70, 2002 https://doi.org/10.1080/00207540110073000
- L. X. Tang, and G. S. Wang, "Decision support system for the batching problems of steelmaking and continuous-casting production," Omega, Volume 36(6), pp.976-991, 2008 https://doi.org/10.1016/j.omega.2007.11.002
- P. Cowling and M. Johansson, "Using real time information for effective dynamic scheduling," European Journal of Operational Research, Volume 139(2), pp.230-244, 2002 https://doi.org/10.1016/S0377-2217(01)00355-1
- R. Piplani and D. Wetjens, "Evaluation of entropy-based dispatching in flexible manufacturing systems," European Journal of Operational Research, Volume 176(1), pp.317-331, 2007 https://doi.org/10.1016/j.ejor.2005.06.066
- R. Vancheeswaran and M. A. Townsend, "Two-Stage heuristic procedure for scheduling job shops," Journal of Manufacturing System, Volume 12(4), pp. 315-325, 1993 https://doi.org/10.1016/0278-6125(93)90322-K
- Y. He and C. W. Hui, "Genetic algorithm for large-size multi-stage batch plant scheduling," Chemical Engineering Science, Volume 62(5), pp.1504-1523, 2007 https://doi.org/10.1016/j.ces.2006.11.049
Cited by
- 시뮬레이션을 이용한 공항 보안검색 시스템 개선으로 이용객 서비스 수준제고 방안 연구 vol.18, pp.3, 2010, https://doi.org/10.9708/jksci.2013.18.3.059