Development of Beam-Column Connection for The New Apartment Structural System

장수명 공동주택용 보-기둥 접합부 시공방법 개발

  • Received : 2010.08.16
  • Accepted : 2010.11.04
  • Published : 2010.12.30

Abstract

Bearing wall system was used extensively in most multi-residential apartment buildings in Korea. However, bearing wall apartments have the lack of architectural plan flexibility, remodelling-incompatible, causing serious economic losses in terms of construction waste. Recently, many researchers have studied the use of Rahmen structure as a potential alternative. The beam-column connection in the paper for long-life apartment housing forms connection of a Rahmen structure utilizing the advantages of steel and reinforced concrete. In addition, reduction of cast-in place concrete and construction schedule is expected by using precast concrete. Reduction effect of quantity decreased construction costs and $CO_2$ emission of key construction materials. However, verifying the feasibility of new construction method entails numerous challenges. Accordingly, the purpose of this study is to analyze the construction feasibility of sleeve, coupler, and pressure welding connections for long-life apartment building structure. A 3D modeling software was used to perform the analysis, and a real scale model was created to verify the results of construction feasibility. By verifying the construction feasibility of beam-column connections, this study will contribute to the efficient application of these methods on construction sites.

Keywords

References

  1. 한국 강구조학회, "강구조 설계", 2007
  2. W.K. Hong, S.C. Park, J.M. Kim, S.G. Lee, S.I. Kim, K.J. Yoon and H.C. Lee, "Composite Beam Composed of Steel and Pre-cast Concrete.(Modularized Hybrid System, MHS) Part I: Experimental Investigation", Structural Design of Tall and Special Buildings, Vol.19, No.3, pp275-289, 2010
  3. W.K. Hong, J.M. Kim, S.C. Park, S.I. Kim, S.G. Lee, H.C. Lee and K.J. Yoon, "Composite Beam Composed of Steel and Pre-cast Concrete.(Modularized Hybrid System, MHS) Part II: Analytical Investigation", Structural Design of Tall and Special Buildings, Vol.18, No.8, pp891-905, 2009 https://doi.org/10.1002/tal.484
  4. W.K. Hong, S.C. Park, H.C. Lee, J.M. Kim, S.I. Kim, S.G. Lee, H.S. Kim and K.J. Yoon, "Composite Beam Composed of Steel and Pre-cast Concrete.(Modularized Hybrid System, MHS) Part III: Application for a 19 story Building", Structural Design of Tall and Special Buildings, Vol.19, No.6, pp.679-706, 2010 https://doi.org/10.1002/tal.507
  5. W.K. Hong, S.I. Kim, S.C. Park, J.M, Kim, S.G. Lee, K.J. Yoon and S.K. Kim, "Composite Beam Composed of Steel and Pre-cast Concrete.(Modularized Hybrid System, MHS) Part IV: Application for Multi-Residential Housing", Structural Design of Tall and Special Buildings, In Press, Published Online(March 25, 2009), DOI:10.1002/ tal.506.
  6. W.K. Hong, J.M. Kim, S.C. Park, S.G. Lee, S.I. Kim, K.J. Yoon, H.C. Kim, and J.T. Kim, "A new apartment construction technology with effective CO2 emission reduction capabilities", Energy - The International Journal, Vol.35, No.6, pp2639-2646, 2010 https://doi.org/10.1016/j.energy.2009.05.036
  7. W.K. Hong, S.C. Park, J.M. Kim, S.I. Kim, S.G. Lee, D.Y. Yune, T.H. Yoon, B.Y. Ryoo ",Development of Structural Composite Hybrid Systems and their Application with regard to the Reduction of CO2 Emissions", Indoor and Built Environment, Vol 19. No 1. pp151-162, 2010 https://doi.org/10.1177/1420326X09358142