References
- 정영수, 박현석, 문지용. (2000). 공정원가 통합관리 활성화 방안: EVMS 현장 적용을 위한 개선 방향. CERIK Working Paper No.25, 한국건설산업연구원 (CERIK).
- 정영수, 우성권. (2001)." 공정/원가 통합관리의 국내 현장 적용 방안", 대한토목학회논문집, 21(3-D), 365-374.
- Jung, Y., and Kang, S. (2007). "Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control", Journal of Construction Engineering and Management, ASCE, 133(1), 10-21. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:1(10)
- Jung, Y. and Lee, S. (2010). "Automated Progress Measurement and Management in Construction: Variables for Theory and Implementation", Proceedings of the Internationl Conference on Computing in Civil and Building Engineering - 2010 (ICCCBE 2010), Nottingham, UK, in press