Abstract
In this paper the feasibility of wind power forecasting from MOS(Model Output Statistics) was evaluated at Gosan area in Jeju during February to Octoberin 2008. The observed wind data from wind turbine was compared with 24 hours and 48 hours forecasting wind data from MOS predicting. Coefficient of determination of measured wind speed from wind turbine and 24 hours forecasting from MOS was around 0.53 and 48 hours was around 0.30. These determination factors were increased to 0.65 from 0.53 and 0.35 from 0.30, respectively, when it comes to the prevailing wind direction($300^{\circ}\sim60^{\circ}$). Wind power forecasting ratio in 24 hours of MOS showed a value of 0.81 within 70% confidence interval and it also showed 0.65 in 80% confidence interval. It is suggested that the additional study of weather conditions be carried out when large error happened in MOS forecasting.