Abstract
In this study, the seepage flow monitoring method by the hydraulic head loss rate was developed for the purpose of application to offshore construction site enclosed by cofferdams in which seepage force varies periodically. The amount of the hydraulic head loss rate newly defined in this graph was in a range between 0 and 1. The zero of the rate means the existence of flow with no seepage resistance. The 1 of the rate means no seepage flow through the ground. The closer to 1 the coefficient of determinant in the hydraulic head loss graph is, the more the ground through which seepage water flows is stable. The closer to 0 the coefficient of determinant in the hydraulic head loss graph is, the more the ground through which seepage water flows was unstable and the higher the possibilities of existence of empty space or of occurrence of piping on the seepage flow pass in the ground is. The hydraulic head loss graph makes it possible to monitor sensitively the situation of seepage flow state, and the graph helps to understand easily the seepage flow state at the specific section on the whole cofferdam.
본 연구에서는 침투압이 주기적으로 변화하는 연근해 가물막이 시공현장에 적용하기 위해서 수두손실그래프에 의한 침투류 감시기법을 개발하였다. 이 기법에서 새로이 정의된 수두손실율은 0~1 사이의 값으로 나타나며 0이면 완전통수상태, 1이면 완전차수상태를 나타낸다. 수두손실그래프의 결정계수가 1에 가까우면 침투경로상의 지반은 안정된 상태에 있음을 나타내고 0에 가까우면 공동이 존재할 수도 있고 파이핑이 진행 중일 수도 있다. 수두손실그래프에 의한 안전관리기법은 침투상태의 변화를 민감하게 감지할 수 있도록 하며 전체 현장에 적용할 경우 각 위치별 하부지반의 침투상태를 세부적으로 판단할 수 있도록 한다.