The Factor Analysis for TPS Productivity Management System in Small and Medium Enterprise

중소기업 TPS 생산성 경영시스템을 위한 요인분석

  • Woo, Tae-Hee (Department of Industrial & Systems Engineering, Seoil University) ;
  • Yang, Kwang-Mo (Department of Industrial Engineering, Yuhan University)
  • Received : 2010.01.20
  • Accepted : 2010.03.12
  • Published : 2010.03.31

Abstract

Competitive capacities in terms of price are rapidly deteriorating since the 1990's due to the competition and rapid pursuit of surrounding nations, exchange rates, increased wages, and labor and management disputes etc. Therefore, this paper shows the significant contents of preceeding research, surveys the employees of small and medium manufacturers who implemented the Toyota production system to conduct various analyses to determine the effect of the operation achievements so as to propose methods to effectively implement the Toyota manufacturing system and maximize long term operational achievements.

Keywords

References

  1. 고재건(1987), "다품종소량생산에 있어 JIT 시스템의 적용".
  2. 김성수(1990), "생산성운동의 연구", 한국생산성학회.
  3. 송한식, 홍성찬역(1994), "신도요타 생산시스템", 기아경제연구소.
  4. 양종택(2001), "도요타 생산방법의 운영성과 관한 연구", 산업과 경영.
  5. 이순룡(2001), "제품,서비스 생산관리론", 법문사.
  6. 학국생산성본부(2002), "국가 생산성 혁신 추진 모델연구", KPC.
  7. 현영석역(1999), "생산방식의 혁명", 기아경제연구소.
  8. Andre' Varella Mollick(2004) "Production smoothing in the Japanese vehicle industry" Int. J. Production Economics, Vol.91.
  9. American Society for Quality, Baldrige National Quality Program(2008), "National Institute Of Standards and Technology", Technology Administration, United States Department of Commerce
  10. Arthur, J.(1994), "Effects of Human Resource Systems on Manufacturing Performance and Tumover", Academy of Management Journal, 37(4), 670-687. https://doi.org/10.2307/256705
  11. Baker, Eugene F(1983) "The Changing Scene on the Production Floor", Management Review, Vol. 72, NO.1, pp.8-11..
  12. B.E Ba:ker, M. A. Huselid and D. Ulrich(2001), "The HR Scorecard: Linking People, Strategy, and Performance, Boston", MA.: Harvard Business School Press.
  13. Burgam, Patrick M(1984) "JIT: On the Move and Out of the Aisles", Manufacturing Engineering, pp.65-71.
  14. Fox, Robert E(1983) "OPT-An Answer for Armica (Part III)", Inventories and Production Magazine, Vol.3, NO 1 January-Februaly.
  15. Gerald Nadler and Shozo Hibino(2004), "Breakthrough 'Thinking, Prima Publishing & Conmmications", Califomia, USA
  16. Hall, Robert W(1982) "Stockless Production for the United States", APICS 25th Annual Conference Proceedings, pp. 314- 318.
  17. Jeffrey K .Liker(2004), " The Toyota Way", McGraw-Hill.
  18. John Latham . John Vinyard(2006), "Organization Diagnosis, Design & Transformation", Willey.
  19. J. Prince, J. M Kay(2003) "Combining lean and agile characteristics: Creation of virtual groups by production flow analysis", Int. J. Production Economics VoI.91.
  20. Kakuro Amasaka(2002) "New JIT: A new management technology principle at Toyota", Int. J. Production Economics Vol.80.
  21. Karmarkar, Uday S(1984) "Controlling W.I.P. and Leadtimes in Job Shop", in Proceedings of Zero Inventory Philosophy and Practices Seminar, St. Louis, Missouri, pp. 156-161.
  22. Keller, J. P(1984) "Reducing Leadtimes: Assum ptions-Techniques-Benefits", Annual International Industrial Conference Proceedings, Chicago, Illinois, pp. 501-506.
  23. Keller, J. P(1984) "The Zero Inventories Concept as Applied to Job Shops", In Proceedings of Zero Inventory Philosophy and Practices Seminar , Louis, Missouri, pp. 18-23.
  24. Mark L. Blazey(2007), "Insight to Performance Excellence 2007", ASQ Quality Press.
  25. McElroy, John(1982) "Makin Just-In-Time Production Pay Off", Automotive Industries, pp. 77-80.
  26. Schuler, R. S. and S. Jackson.(1987), "Linking Competitive Strategies wth Human Resourcee Management Practices", Academy of Management Executive," 1, 207-219. https://doi.org/10.5465/AME.1987.4275740
  27. 오노다이치(1991), "현장경영", 일본능률협회 매너지먼트센타.
  28. 高梨智弘(2006), "벤치마킹 입문", 일본 생산성출판.
  29. 野中有欧部외 3인(1997), "Innovation Company", DIAMOND사.