초록
In Korea, experiences in wind farm operation are limited and the foundation for setting standards in electrical system connection is still weak in comparison to the operation experience in connection of wind power to the electrical system of other countries around the world. Therefore, standards that are being applied in various countries for connection and optimal operation in wind farms need to be examined, and in addition, procedures for the assessment of the effects on the system are needed for setting connection standards and optimal operation plans in accordance with Korean electrical system characteristics. In this study, procedures for the assessment of effects of wind power connection to the electrical system are presented.