References
- Arijit Bhattacharya, Bijan Sarkar, and Sanat K. Mukherjee (2007), Distance-based consensus method for ABC analysis, International Journal of Production Research, 45(15), 3405-3420. https://doi.org/10.1080/00207540600847145
- Cachon, G. P. (1999), Managing supply chain demand variability with scheduled ordering policies, Management Science, 45(6), 843-856. https://doi.org/10.1287/mnsc.45.6.843
- Chan, H. K. (2007), A pro-active and collaborative approach to reverse logistics-a case study, Production Planning and Control, 18(4), 350-360. https://doi.org/10.1080/09537280701318736
- DeCroix, G. A. and Zipkin, P. H. (2005), Inventroy management an assembly system with product or component retuen, Management Science, 51(8), 1250- 1265. https://doi.org/10.1287/mnsc.1050.0394
- Depuy, G. W., Usher, J. S., Walker, R. L., and Taylor, G. D. (2007), Production planning for remanufactured products, Production Planning and Control, 18(7), 573-583. https://doi.org/10.1080/09537280701542210
- Guide Jr., V. D. R. and Srivastava, R. (1997), An evaluation of order release strategies in a remanufacturing environment, Computer Operations Research, 24(1), 37-47. https://doi.org/10.1016/S0305-0548(96)00023-8
- Guo, J., Ko, Y. D., and Hwang, H. (2010), A manufacturing/ remanufacturing system with the consideration of required quality of end-of-used products, Industrial Engineering and Management Systems, 9(3), 204-214. https://doi.org/10.7232/iems.2010.9.3.204
- Jonsson, P. and Mattisson, S.-A. (2008), Inventory management practices and their implications on perceived planning performance, International Journal of Production Research, 46(7), 1787-1812. https://doi.org/10.1080/00207540600988071
- Louly, M. A., Dolgui, A., and Hnaien, F., Optimal supply planning in MRP environments for assembly systems with random component procurement times, International Journal of Production Research, 46 (9), 5441-5467.
- Ouyang, Huiqing and Zhu, Xiangyang (2009), A simple algorithm for the basic (R, Q) inventory control model with return flow, Asia-Pacific Journal of Operational Research, 26(3), 383-398. https://doi.org/10.1142/S0217595909002262
- Silver, E. A., Pyke, D. F. and Peterson, R. (1998), Inventory management and production planning and scheduling, 3rd ed, J. Wiley.
- Stefan, Minner, (2001), Strategic safety stocks in reverse logistics supply chain, International Journal of Production Economics, 71, 417-428. https://doi.org/10.1016/S0925-5273(00)00138-9
- Vachon, Stephan (2007), Green supply chain practices and the selection of environmental technologies, International Journal of Production Research, 45 (18-19), 4357-4379. https://doi.org/10.1080/00207540701440303
- Van der Laan, E., Dekker, R., Salomon, M., and Ridder, A. (1996), An (s, Q) inventory model with remanufacturing and disposal, International Journal Production Economics, 46(2), 339-350.