참고문헌
- Allahverdi, A., Ng, C T., Cheng, T. C. E., and Kovalyov, M. Y. (2008), A survey of scheduling problems with setup times and costs, European Journal of Operational Research, 187(3), 985-1032. https://doi.org/10.1016/j.ejor.2006.06.060
- Arzi, Y. and Raviv, D. (1998), Dispatching in a workstation belonging to a re-entrant production line under sequence-dependent set-up times, Production Planning and Control, 9(7), 690-699. https://doi.org/10.1080/095372898233696
- Azizoglu, M. and Kirca, O. (1999), On the minimization of total weighted flow time with identical and uniform parallel machine, European Journal of Operational Research, 113(1), 91-100. https://doi.org/10.1016/S0377-2217(97)00427-X
- Azizoglu, M. and Webster, S. (2003), Scheduling parallel machines to minimize weighted flowtime with family set-up times, International Journal of Production Research, 41(6), 1199-1215. https://doi.org/10.1080/0020754021000042959
- Barnes, J. and Brennan, J. J. (1977), An improved algorithm for scheduling jobs on identical machines, AIIE Transactions on Computing, 9(1), 25-31. https://doi.org/10.1080/05695557708975117
- Bruno, J., Coffman, J. E., and Sethi, R. (1974), Scheduling independent tasks to reduce mean finishing time, Communications of ACM, 17(7), 382-387. https://doi.org/10.1145/361011.361064
- Chern, C. C. and Liu, Y. L. (2003), Family-based scheduling rules of a sequence-dependent wafer fabrication system, IEEE Transactions on Semiconductor Manufacturing, 16(1), 15-25. https://doi.org/10.1109/TSM.2002.807742
- Cigolini, R., Comi, A., Micheletti, A., Perona, M., and Portioli, A. (1999), Implementing new dispatching rules at SGS-Thomson Microelectronics, Production Planning and Control, 10(1), 97-106. https://doi.org/10.1080/095372899233479
- Dessouky, M. M. (1998), Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness, Computers and Industrial Engineering, 34(4), 794-806.
- Dunstall, S. and Wirth, A. (2005a), A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines, European Journal of Operational Research, 167(2), 283-296. https://doi.org/10.1016/j.ejor.2004.03.022
- Dunstall, S. and Wirth, A. (2005b), Heuristic methods for the identical parallel machine flowtime problem with set-up times, Computers and Operations Research, 32(9), 2479-2491. https://doi.org/10.1016/j.cor.2004.03.013
- Duenyas, I., Fowler, J. W., and Schruben, L. W. (1994), Planning and scheduling in Japanese semiconductor manufacturing, Journal of Manufacturing Systems, 13(5), 323-332. https://doi.org/10.1016/0278-6125(94)P2582-Y
- Eastman, W., Even, S., and Isaacs, I. (1964), Bounds for the optimal scheduling of n jobs on m processors, Management Science, 11(2), 268-279. https://doi.org/10.1287/mnsc.11.2.268
- Elmaghraby, S. E. and Park, S. H. (1974), Scheduling jobs on a number of identical machines, AIIE Transactions on Computing, 6(1), 1-13. https://doi.org/10.1080/05695557408974926
- Fowler, J., Hogg, G. L., and Phillips, D. T. (1992), Control of multiporduct bulk service diffusion/oxidation processes, IIE Transactions 24(4), 84-96. https://doi.org/10.1080/07408179208964236
- Fowler, J., Knutson, K., and Carlyle, M. (2000), Comparison and evaluation of lot-to-order matching policies for a semiconductor assembly and test facility, International Journal of Production Research, 38(8), 1841-1853. https://doi.org/10.1080/002075400188627
- Glassey, C. R. and Resende, M. C. G. (1988), A scheduling rule for job release in semiconductor fabrication, Operations Research Letters, 7(5), 213-217. https://doi.org/10.1016/0167-6377(88)90033-8
- Glassey, C. R. and Weng, W. W. (1991), Dynamic batching heuristic for simultaneous processing, IEEE Transactions on Semiconductor Manufacturing, 4(2), 77-82. https://doi.org/10.1109/66.79719
- Graves, S. C., Meal, H. C., Stefek, D., and Zeghmi, A. H. (1983), Scheduling of re-entrant flow shops, Journal of Operations Management, 3(4), 197-207. https://doi.org/10.1016/0272-6963(83)90004-9
- Johri, P. K. (1993), Practical issues in scheduling and dispatching in semiconductor wafer fabrication, Journal of Manufacturing systems, 12(6), 474-485. https://doi.org/10.1016/0278-6125(93)90344-S
- Kim, Y.-D., Kim, J.-U., Lim, S.-K., and Jun, H.-B. (1998a), Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility, IEEE Transactions on Semiconductor Manufacturing, 11(1), 155-164. https://doi.org/10.1109/66.661295
- Kim, Y-D., Lee, D-H., and Kim, J-U. (1998b), A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities, Journal of Manufacturing Systems, 17(2), 107-117. https://doi.org/10.1016/S0278-6125(98)80024-1
- Ko, H. H., Baek, J. K., Kang, Y. H., and Kim, S. S. (2004), A scheduling scheme for restricted parallel machines cycling process, Journal of the Korean Institute of Industrial Engineers, 30(2), 107-119.
- Lawler, E. L. and Moore, J. M. (1969), A functional equation and its application to resource allocation and sequencing problems, Management Science, 16(1), 77-84. https://doi.org/10.1287/mnsc.16.1.77
- Lee, C. Y. and Uzsoy, R. (1992), A new dynamic programming algorithm for the parallel machines total weighed completion time problem, Operational Research Letters, 11(2), 73-75. https://doi.org/10.1016/0167-6377(92)90035-2
- Lee, G.-C., Kim, Y.-D., and Choi, S.-W. (2004), Bottleneck-focused scheduling for a hybrid flowshop, International Journal of Production Research, 42(1), 165-181. https://doi.org/10.1080/00207540310001602892
- Lee, K. H., Hong, Y. S., and Kim, S. Y. (1995), Production scheduling semiconductor wafer fabrication process, Journal of the Korean Institute of Industrial Engineers, 21(3), 357-369.
- Lin, J. T., Wang, F. K., and Kuo, P. C. (2005), A parameterized- dispatching rule for a logic IC sort in a wafer fabrication, Production Planning and Control, 16(5), 426-436. https://doi.org/10.1080/09537280500110623
- Lou, S. X. C. and Karger, P. W. (1989), A robust production control policy for VLSI wafer fabrication, IEEE Transactions on Semiconductor Manufacturing, 2(4), 159-164. https://doi.org/10.1109/66.44620
- Monch, L., Balasubramanian, H., Fowler, J. W., and Pfund, M. E. (2005), Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times, Computers and Operations Research, 32(11), 2731-2750. https://doi.org/10.1016/j.cor.2004.04.001
- Monma, C. L. and Potts, C. N. (1989), On the complexity of scheduling with batch setup times, Operational Research, 37(5), 798-804. https://doi.org/10.1287/opre.37.5.798
- Montgomery, D. C. (2001), Design and analysis of experiments, Wiley, New York.
- Min, H. S. and Yih, Y. (2003), Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system, International Journal of Production Research, 41(16), 3932-3941.
- Nawaz, M., Enscore, E. E., and Ham, I. (1983), A heuristic algorithm for the m-machine, n-job flow-shop scheduling problem, Omega, 11(1), 91-95. https://doi.org/10.1016/0305-0483(83)90088-9
- Park, M.-W. and Kim, Y.-D. (1997), Search heuristics for a parallel machine scheduling problem with ready times and due dates, Computers and Industrial Engineering, 33(3-4), 793-796. https://doi.org/10.1016/S0360-8352(97)00255-6
- Pfund, M., Fowler, J. W., Gadkari, A., and Chen, Y. (2008), Scheduling jobs on parallel machines with setup times and ready times, Computers and Industrial Engineering, 54(4), 764-782. https://doi.org/10.1016/j.cie.2007.08.011
- Robinson, J. K., Fowler, J. W., and Bard, J. F. (1995), Use of upstream and downstream information in scheduling semiconductor batch operations, International Journal of Production Research, 33(7), 1849-1869. https://doi.org/10.1080/00207549508904785
- Schutten, J. M. J. and Leussink, R. A. M. (1996), Parallel machine scheduling with release dates, due dates and family setup times, International Journal of Production Economics, 46/47, 119-125. https://doi.org/10.1016/0925-5273(95)00086-0
- Uzsoy, R., Lee, C. Y., and Martian-Vega, L. A. (1992), A review of production planning and scheduling models in the semiconductor industry Part I : System characteristics, performance evaluation and production planning, IIE Transaction, 24(4), 47-60. https://doi.org/10.1080/07408179208964233
- Uzsoy, R., Lee, C. Y., and Martian-Vega, L. A. (1994), A review of production planning and scheduling models in the semiconductor industry Part II : Shop-floor control, IIE Transaction, 26(5), 44-55. https://doi.org/10.1080/07408179408966627
- Webster, S. (1993), A priority rule for minimizing weighted flow time in a class of parallel machine scheduling problems, European Journal of Operational Research, 70(3), 327-334. https://doi.org/10.1016/0377-2217(93)90244-H
- Webster, S. (1994), A note on "schedule of n jobs on two identical machines to minimize weighted mean flow time, Computers and Industrial Engineering, 26(4), 795-796. https://doi.org/10.1016/0360-8352(94)90014-0
- Webster, S. and Azizoglu, M. (2001), Dynamic programming algorithms for scheduling parallel machines with family setup times, Computers and Operations Research, 28(2), 127-137. https://doi.org/10.1016/S0305-0548(99)00094-5
- Wein, L. M. (1988), Scheduling semiconductor wafer fabrication, IEEE Transactions on Semiconductor Manufacturing, 1(3), 115-130. https://doi.org/10.1109/66.4384
- Yoon, H. J. and Lee, D. Y. (2004), Deadlock-free scheduling of photolithography equipment in semiconductor fabrication, IEEE Transactions on Semiconductor Manufacturing, 17(1), 42-54. https://doi.org/10.1109/TSM.2003.822730
- Zhu, X., Wilhelm, W. E. (2006), Scheduling and lot sizing with sequence- dependent setup : a literature review, IIE Transactions, 38(11), 987-1007. https://doi.org/10.1080/07408170600559706