Abstract
In this paper considered is the provisioning quantity determination problem of consumable concurrent spare parts (CSP) of a new equipment system to minimize the procurement cost under the operational availability constraint. When a part fails, repair of the failed part is impossible and the part is replaced and cannibalization is allowed. The failure of a part is assumed to follow a Poisson process and the operational availability in CSP is defined. The solution procedure consists of two parts. Firstly, a heuristic algorithm is developed under the assumption that the failure rate is constant during the CSP period. Secondly, proposed is a simulation search procedure which improves the heuristic solution to the near optimal solution in a reasonable amount of time. An illustrative example is shown to explain the solution procedure.