Abstract
The performance test in a public survey is conducted by a sample survey and the sampling rate of the performance test is a very important factor in the test process. Since the current sampling rate was decided empirically at an earlier time, it has been criticized for two points: the first is that it has a lack of a theoretical background on the decision for the sampling rate and the second is that the sampling rate should be improved in accordance with current test situations. In this paper, we review the present state of performance tests in public surveys in Korea and study the relationship between the rate of the performance test and fitness probability, number of tests, and the success rate in order to create a theoretical background to improve the test rate. In addition, we discuss relationship between the test rate and cost in the performance test.
공공측량에서 성과 심사는 표본조사로 이루어지기 때문에 성과심사에서 심사비율은 매우 중요한 요인이다. 현행 성과심사 심사비율은 성과심사 제도 실시 초기에 경험적으로 결정되었기 때문에 이론적인 바탕이 부족하다는 지적과 함께 최근의 심사 여건에 맞도록 심사비율을 개선해야 한다는 의견이 제기되었다. 본 논문에서는 현재 우리나라에서 이루어지고 있는 공공측량 성과심사의 현황을 개략적으로 알아보고 현행 성과 심사 심사비율을 개선하기 위한 이론적 토대로서 성과심사 심사비율과 적합확률, 심사대상 수, 합격 비율의 관계를 살펴본다. 또한 성과심사 심사비율과 심사비용과의 관계를 토의한다.