References
- 김현수, 한대의, '국내 리메뉴팩처링 시스템 산업의 문제점과 개선방안에 관한 연구', 산업기술종합연구소, 제17권(1999), pp.263-277
- 이동은, 이운식, 구평회, 이강배, '용량제약을 갖는 단일설비에서의 동적 재생산계획문제', '한국경영공학회지', 제12권, 제1호(2007), pp.11-24
- 주운기, '단일 재생 처리 설비를 이용한 재생계획', '한국경영과학회지', 제25권, pp.111-122
- Boaz Golany, Jian Yag, and Gang Yu, 'Economic lot-sizing with remanufacturing options,' IIE Transactions, Vol.33(2001), pp. 995-1003 https://doi.org/10.1080/07408170108936890
- Florian, M. and M. Klein, 'Deterministic production planning with concave cost and capacity constraints,' Management Science, Vol.18(1971), pp.12-20 https://doi.org/10.1287/mnsc.18.1.12
- Florian, M., Lensta, J,K., and A. RinnooyKan, 'Deterministic production planning : algorithms and complexity,' Management Science, Vol.26, No.7(1980), pp.374-384
- Guide, Jr. V.D., 'Scheduling using drumbuffer- rope in a remanufacturing environment,' International Journal of Production Research, Vol.34(1996), pp.1081-1091 https://doi.org/10.1080/00207549608904951
- Guide, Jr. V.D. and Spencer, M.S., Roughcut capacity planning for remanufacturing firms, Production Planning and Control, 1995
- Inderfurth, K., 'Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution," Int. J. of Production Economics, Vol.90(2004), pp.325-343 https://doi.org/10.1016/S0925-5273(02)00470-X
- Lambert, A.M. and H. Luss, 'Production planning with time-dependent capacity bounds,' European Journal of Operations Research, Vol.9, No.4(1982), pp.275-280 https://doi.org/10.1016/0377-2217(82)90035-2
- Love, S.F., 'Bounded production and inventory models with piecewise concave costs,' Management Science, Vol.20, No.3 (1973), pp.313-318 https://doi.org/10.1287/mnsc.20.3.313
- Lee, C.Y. and E.V., 'Denardo, Rolling planning horizon : error bounds for the dynamic lot size model,' Mathematics of Operations Research, Vol.11, No.3(1986), pp.423-432 https://doi.org/10.1287/moor.11.3.423
- Richter, K. and M., Sombrutzki, 'Remanufacturing planning for the reverse Wagner/ Whitin models,' European Journal of Operational Research, Vol.121(2000), pp.304-315 https://doi.org/10.1016/S0377-2217(99)00219-2
- Richter, K. and J. Weber, 'The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost,' Int. J. of Production Economics, Vol.71 (2001), pp. 447-456 https://doi.org/10.1016/S0925-5273(00)00142-0
- Sobel, M.J., 'Smoothing start-up and shutdown costs: concave case,' Management Science, Vol.17, No.1(1970), pp.78-91 https://doi.org/10.1287/mnsc.17.1.78
- Sung, C.S. and W.S. Lee, 'Rolling schedules for a dynamic lot-sizing problem with startup costs,' Engineering Optimization, Vol.22, No.2(1994), pp.137-152 https://doi.org/10.1080/03052159308941330
- Sung, C.S. and W.S. Lee, 'Setup cost reduction in a dynamic lot size model with multipIe finite production rates,' Engineering Optimization, Vol.24(1995), pp.19-37 https://doi.org/10.1080/03052159508941181
- Swoveland, C., 'A deterministic multi-period production planning model with piecewise concave production and holding-backorder costs,' Management Science, Vol.21, No.9(1975), pp.1007-1013 https://doi.org/10.1287/mnsc.21.9.1007
- Wagner, H.M. and T.M. Whitin, 'Dynamic version of the economic lot size model,' Management Science, Vol.5, No.1(1958), pp. 89-96 https://doi.org/10.1287/mnsc.5.1.89
- Yang, J., B. Goany, and G. Yu, 'A concave- Cost Production Planning Problem with Remanufacturing Options,' Naval Research Logistics, Vol.52(2005), pp.443-458 https://doi.org/10.1002/nav.20089
- Zangwill, W.I., 'A deterministic multi-period production scheduling model with backlogging,' Management Science, Vol.13, No.1 (1966), pp.105-119 https://doi.org/10.1287/mnsc.13.1.105
- Zangwill, W.I., 'A backlogging model and a multi -echelon model of a dynamic lot size production system-a network approach,' Management Science, Vol.15, No.9(1969), pp.506-527 https://doi.org/10.1287/mnsc.15.9.506