References
- AIMSystems Inc. (2006), Introductionof nanoDSP 2.0 (AIM’sReal-timeDispatcher) , AIMSystems Inc, Seoul, Korea
- AkGalr, E., Uzsoy, R., Hiscock, D. G., Moser, A. L., and Teyner, T. J. (2000), Alternative Loading and Dispatching Policies for Furnace Operations in SemiconductorManufacturing:AComparison by Simulation,Proceedingsof the 2000Winter Simulation Conference, 1428-1435
- Asmundsson, J., Rardin, R. L., and Uzsoy, R. (2006), Tractable Nonlinear Production Planning Models for Semiconductor Wafer Fabrication Facilities, IEEE Transactions on Semiconductor Manufacturing, 19(1), 95-111 https://doi.org/10.1109/TSM.2005.863214
- Chen, Y-.J., Yu, G., Huang, K.-S., and Wang, I. (2000), A Next Queue Algorithm in Real Time Dispatching System of Semiconductor Manufacturing, TheNinth International Symposiumon Semiconductor Manufacturing, 67-70
- Gupta,A.K. and Sivakumar, A. I. (2004),Multi-objective Scheduling of Two-job Families on a SingleMachine,Omega, 33(5), 299-405
- Hsieh, B-.W., ChangS-.C., Chen, C-.H. and Chang, M-.C. (2003), Efficient Composition of Good Enough Dispatching Policies for Semiconductor Manufacturing,2003 IEEE International Symposiumon SemiconductorManufacturing,67-70
- Jeong, K.-C. (2008),Design of an AdaptiveDispatchingArchitecture for theOptimal Operation of Semiconductor Fabrications-Focused on Machines with Setup Times (ResearchReport) , Chungbuk National University, Cheongju, Korea
- Jeong, K.-C. and Kim, Y.-D. (1997), A Real-Time SchedulingMechanismfor a Flexible Manufacturing System: Using Simulation and Dispatching Rules, International Journal ofManufacturingSystem, 36(9), 2609-2626 https://doi.org/10.1080/002075498192733
- Kim, M.-H. and Kim, Y.-D. (1994), Simulation-Based Real-Time scheduling Mechanism in a Felexible Manufacturing System, Journal of Manufacturing Systems, 13(2), 85-93 https://doi.org/10.1016/0278-6125(94)90024-8
- Koo, P., Suh, J., and Jang, J. (2003), A New Vehicle Dispatching in Semiconductor Intra-bay Material Handling Systems, IE Interfaces, 16(Special Issue), 93-98
- Kuhl,M. E. and Laubisch,G. R. (2004),ASimulation Study ofDispatching Rules and Rework Strategies in Semiconductor Manufacturing, 2004 IEEE Conference andWorkshoponAdvanced SemiconductorManufacturing, 325-329
- Monch, L., Balasubramanian, H., Fowler, J. W., and Pfund, M. E. (2005), Heuristic Scheduling of Jobs on Parallel BatchMachines with Incompatible Job Families and Unequal Ready Times, Computers and Operations Research, 32(11), 2731-2750 https://doi.org/10.1016/j.cor.2004.04.001
- Monch, L. andDriebel, R. (2005), ADistributed Shifting BottleneckHeuristic for Complex Job Shops,Computers& Industrial Engineering, 49(3), 363-380 https://doi.org/10.1016/j.cie.2005.06.004
- Monch, L., Schabacker, R., Pabst, D., and Fowler, J.W. (2007), Genetic Algorithm-based SubproblemSolution Procedures for aModified Shifting BottleneckHeuristic for Complex Job Shops,EuropeanJournal ofOperational Research, 177(3), 2100-2118 https://doi.org/10.1016/j.ejor.2005.12.020
- Pierce,N.G. andYurtsever, T. (2000),Value-basedDispatching for SemiconductorWafer Fabrication,2000 IEEE/SEMIAdvancedSemiconductorManufacturing Conference, 245-249
- Sethi, S. P., Sriskandarajah, C., Chu, K.-F., and Yan, H. (1999), Efficient Setup/Dispatching Policies in a Semiconductor Manufacturing Facility, Proceedings of the38th ConferenceonDecision andControl Phoenix, 1368-1373
- Suh, J., Koo, P., Jang, J. (2003), Development of a Dispatching Logic for ControllingMaterial Handling in Semiconductor Fab, Proceedings of the2003 SpringConferenceof KIEE/KORMS, 364-368
- Tyan, J. C., Du, T. C., Chen, J. C., and Chang, I-.H. (2004),Multiple Response Optimization in a Fully Automated Fab: an Integrated Tool and Vehicle Dispatching Strategy,Computers& Industrial Engineering, 46(1), 121-139 https://doi.org/10.1016/j.cie.2003.11.003