참고문헌
- Bozdah, C. E.etal. (2003), Fuzzy group decisionmaking for selection among computer integrated manufacturing system,Computers in Industry, 51, 13-29 https://doi.org/10.1016/S0166-3615(03)00029-0
- Butler, A. et al. (1997), Linking the balanced scorecard to statege, Long range planning
- Chang, D. Y. et al. (1996), Applications of the extent analysis on fuzzy AHP, European journal of operational research, 95, 649-655 https://doi.org/10.1016/0377-2217(95)00300-2
- Chen, S. M. (1996), Evaluating weapon systems using fuzzy arithmetic operations, Fuzzy sets and systems, 77, 265-276 https://doi.org/10.1016/0165-0114(95)00096-8
- Cheng, C. H. et al. (1994), Evaluating weapon system by analytical hierarchy process based on fuzzy scales, Fuzzy sets and systems, 63, 1-10 https://doi.org/10.1016/0165-0114(94)90140-6
- Cheng, C. H. (1999), Evaluating weapon systems using ranking fuzzy numbers, Fuzzy sets and systems, 107, 25-35 https://doi.org/10.1016/S0165-0114(97)00348-5
- Choi, J. H. et al. (2006), A Case Study on the Process Selection and Implementation of Business Process Management in Mobile Telecommunications Company, Information SystemsReview, 8(1), 25-41
- Kaplan R. S. and Norton, D. P. (1992), The Balanced ScorecardMeasures ThatDrive Performance,HavardBusinessReview.
- Kaplan R. S. andNorton,D. P. (1993), Putting the Balanced Scorecard to work, HavardBusinessReview
- KaplanR. S. andNorton,D. P. (1996),Using the balanced scorecard as a strategicmanagement system,HavardBusinessReview
- Kim, S. H. et al. (1994), Dynamic Reengineering : The Practical Strategy of Management Innovation, TheKorea EconomicDaily, 91-111.
- Lee, S. C. et al. (2005), Study on the Solution Selection Model of Information Systems Using Fuzzy AHP, Entrue Journal of Information Technology, 4(1), 79-89
- Letza, S. R. (1996), The design and implementation of the balanced business scorecard : An analysis of three companies in practice, Business process re-engineering and management journal
- Martinsons,M.etal. (1999), The balanced scorecard : a foundation for the strategic management of information systems,Decision support systems
- Mon,D. L.etal. (1994), Evaluatingweapon systemusing fuzzy analytic hierarchy process based on entropy weight, Fuzzy sets and systems, 62, 127-134 https://doi.org/10.1016/0165-0114(94)90052-3
- Park, D. J. (1995), A Study on theDetermination of Process Selection Factors in Business Reengineering,The J. of Southern Seoul University, 1, 233-248
- Sinur J. (2003), The Business ProcessManagement Scenario,Gartner
- Smith, H. et al. (2003), Business Process Management : The Third Wave, Meghan-Kiffer Press, Florida, USA
- Smith, R. F. (2007), Business ProcessManagement and the Balanced Scorecard, John and Sons, Inc
- Verner, L. (2004), BPM : The Promise and the Challenge, QUEUE(www.acmqueue.com)
- Weck, M. et al. (1997), Evaluating alternative production cycles using the extended fuzzy AHP method, European jounal of operational research, 100, 351-365 https://doi.org/10.1016/S0377-2217(96)00295-0