References
- Choi, B.K. and Seo, J. C. (2008), Capacity-FilteringAlgorithmfor Finite Capacity Planning of a Flexible FlowLine, International Journal of ProductionResearch, 18 February 2008,DOI : 10.1080/00207540701644201(Published onOnline)
- Chung-HsingYeh(2000), Acustomer-focused planning approach tomake-to-order production, Industrial Management andData Systems, 100(4), 180-187 https://doi.org/10.1108/02635570010328693
- DavidHsieh (2007), TFT LCDMarketUpdate forKGI Securities,DisplaySearch, Available via http://www.displaysearch.com/cps/rde/xbcr/displaysearch/ 20071025_David_Hsieh_DisplaySearch_TFT_LCD_Update_For_KGI.pdf (accessed October 10, 2008).
- i2 Technologies (2006), Factory Planner Guide, Available via http://www.i2.com/assets/pdf/pds_factory_planner_pds7305.pdf(accessedOctober 10, 2008)
- James T. Lin, Tzu-Li Chen, and Yen-Ting Lin (2006), A Hierarchical Planning and Scheduling Framework for TFT-LCDProduction Chain, IEEE International Conferenceon ServiceOperations and Logistics and Informatics, 711-716
- Jeong, B.,Kim, S. and Lee, Y. (2001), An assemb-ly scheduler for TFTLCDmanufacturing, Computers and Industrial Engineering, 41, 37-58. https://doi.org/10.1016/S0360-8352(01)00041-9
- Na,H. J., Baek, J.K.,Kwon, I.H.,Kang, Y.H., andKim, S. S. (2001), The study of production scheduling scheme in TFT- LCDfactory,Proceedings of the2001 KIIE SpringConference, 958-961
- Park, B. C, Park, E. S, Kim, B.H., Choi, B.K., and Lee, J.H. (2008), Simulation based Planning and Scheduling System for TFT-LCD Fab, Proceedings of the 2008Winter Simulation Conference, accepted for publication
- Song,W., Seo,D.W, Shin,H. J., Baek, J. K., andKim, S. S. (2000), Astudy on integrated production planning and coordination for TFT-LCD factory, Proceedings of the2000 KORMS SpringConference, 566-568.
-
VMS-Solutions(2006), SeePlan LSE
${\circledR}$ Brochure, Available via http://www.vmssolutions.com/(accessed September 20, 2006)