Abstract
This research utilized the manual to calculate the structural scale of stone and gabion, which was developed through comparison and verification of the results drawn by hydraulic model experiment and existing empirical formula. Appropriate structural scale of stone according to the construction site when the critical velocity was exceeded, utilizing the previously expected and recorded data on current velocity per day and per hour during the final closure period for Saemangeum sea dike. Also, the scale of rocks was presented, considering the altercation in water depth according to the construction. The developed manual offered appropriate rate of mixed use of stone and gabion that suits various flow velocities, which will minimize any loss of stone-gabion and contribute to successful final closure, and proved the utility and application of the manual.
본 연구에서는 수리모형실험 결과 및 기존 경험식의 비교검증을 토대로 개발된 사석 및 돌망태 규모를 산정하기 위한 매뉴얼을 이용하여 새만금 방조제 끝막이 공사기간 동안 사전에 예측된 일별, 매시간별, 발생 유속 자료를 이용하여 발생유속에 따른 사석규모와 사석규모의 한계유속 초과시 적절한 돌망태의 혼용율을 시공현장에 제공하였다. 또한 시공에 따른 수심변화를 고려하여 수심별 사석규모도 제공하였다. 개발된 매뉴얼을 통해 발생유속에 따른 사석 및 돌망태 규모와 사석과 돌망태의 적정혼용율을 제시함으로써 시공에 따른 재료(사석 및 돌망태)의 유실을 최소화하여 성공적인 끝막이가 될 수 있도록 하였으며, 개발된 매뉴얼의 적용성을 입증하였다.