Study on the Transmission Delay of Two Priority Classes in One Node in the Foundation Fieldbus

파운데이션 필드버스에서 두 개의 우선순위 데이터를 갖는 노드의 데이터 전송지연시간에 관한 연구

  • 이용희 (한양대학 전자전기제어계측학과) ;
  • 홍승호 (한양대학 전자정보시스템공학)
  • Published : 2009.02.01

Abstract

The foundation fieldbus(FF) is one of the fieldbuses most widely used for process control and automation, In order for system designer to optimize medium management, it is imperative to predict transmission delay time of data. In a former research, mathematical modeling to analyze transmission delay of FF token-passing system has been developed based on the assumption that a device node has only one priority data(1Q model), From 1Q model, all of the device nodes, which are connected on the FF system, are defined priority level in advance, and as system operates, data are generated based on given priority level. However, in practice, some non-periodic data can have different priority levels from one device. Therefore, new mathematical model is necessary for the case where different priority levels of data are created under one device node(2Q model). In this research, the mathematical model for 2Q model is developed using the equivalent queue model. Furthermore, the characteristics of transmission delay of 2Q model which is presented in this paper were compared with 1Q model. The validity of the analytical model was verified by using a simulation experiment.

Keywords

References

  1. J. Berge, fieldbuses for Process Control: Engineering Operation, and Maintenance, ISA, Research Triangle Park, NC, 2004
  2. P. Pinceti, 'Fieldbus: More than a Communication Link', IEEE Instrumentation & Measurement Magazine, vol 7, No.1, pp. 17- 23, 2004 https://doi.org/10.1109/MIM.2004.1288732
  3. Fieldbus Foundation, FOUNDATION$^{TM}$ Specifications: Data Link Protocol Specifications, Austin, TX, 1997
  4. S.H. Hong and LH. Choi, 'Experimental evaluation of a bandwidth allocation scheme for foundation fieldbus', IEEE Trans. on Instrument and Measurement, pp. 1787 - 1791, 2003 https://doi.org/10.1109/TIM.2003.820447
  5. R. Dittmann and F. Hlibner, 'Discrete-time analysis of a cyclic service system with gated limited service', Report No. 67, University of Wurzburg, Germany, 1993
  6. P.J. Kuehn, 'Multiqueue systems with nonexhaustive cyclic service', Bell Syst. Tech. J., pp. 671 - 698. 1979
  7. P. King, Computer and Communication Systems Perfonnance Modeling, Prentice - Hall, Upper Saddle River, NJ, 1990
  8. H. Levy and M. Sidi, 'Polling systems: applications, modeling and optimization', IEEE Trans. on Communication, vol. 38, No. 10, pp. 1750 - 1760, 1990 https://doi.org/10.1109/26.61446
  9. E. Tovar, F. Vasques and A. Burns, 'upporting real-time distributed computer-controlled systems with multi-hop P-NET networks' Control Engineering Practice, vol. 7, Issue 8, pp. 1015-1025, 1999 https://doi.org/10.1016/S0967-0661(99)00073-8
  10. S.H. Hong, 'Approximate analysis of timer-controlled priority scheme in the single-service token passing systems', IEEE/ACM Trans. on Networking. pp. 206- '215, 1994 https://doi.org/10.1109/90.298438
  11. YH, Lee and S.H. Hong, 'Dependency on prioritized data in the delay analysis of foundation fieldbus' Control Engineering Practice, DOI:10.1016/j.conengprac. 2008.11.003, In print
  12. W.H. Press, B.P. Flannery, SA Teukolsky and W.T. Vetterling Numerical Recipes: The Art of Scientific Computing. Cambridge University Press, Cambridge, UK, 1986
  13. S.H. Hong and S.J. Ko, 'A simulation study on the performance analysis of the data link layer of IEC/lSA fieldbus', Simulation, pp. 109 -118, 2001
  14. W.D. Kelton, RP. Sadowski, and DA Sadowski, Simulation with ARENA, McGraw-Hill College Division, New York, NY, 2001