한국산업융합학회 논문집 (Journal of the Korean Society of Industry Convergence)
- 제11권1호
- /
- Pages.11-18
- /
- 2008
- /
- 1226-833X(pISSN)
- /
- 2765-5415(eISSN)
비점원 오염부하량 산정에 관한 연구
A Study on The Non-Point Source Pollutant Load Routing Method
- Kim, Young-Seob (Dept. of Civil Engineeting Daegu University) ;
- Lee, Gwan-Young (Dept. of Civil Engineeting Daegu University)
- 투고 : 2007.11.22
- 심사 : 2008.02.22
- 발행 : 2008.02.29
초록
After execute quantitative analysis that choose station and compose floodgate quality of water net and use floodgate data and quality of water data analysis target Sign of the cock as 1 dimension access for Non-point pollution source pollution and estimate of Gaeuncheon's at Kyongsangbukdo report to the Throne in this research, presented parameter conclusion notation model (AGNPS) in real condition of our agricultural area through comparison with spot value and result is as following in reply. With result observation and analysis result of the AGNPS model the comparison which it will pay from the hazard which it analyzes 2005, the rainfall thought which is used in the analysis to select 8 heavy rain thoughts 2005 July - is data until of September. Actual amount of rainfall 6.0~195.0 mm one time the antecedent precipitation showed API5 case 0.0~507.0mm and were observed peak flows (Qpeak) each from the P-1