Application of Simulation for Road Design Evaluation

도로설계 평가를 위한 3차원 시뮬레이션 적용

  • Kim, Ga-Ya (Department of Urban Engineering, Dong-Eui University) ;
  • Jung, Beam-Seok (Department of Civil Engineering, Dong-Eui University) ;
  • Kim, Nam-Seok (Department of IT.Design, Silla University)
  • Received : 2008.05.06
  • Accepted : 2008.06.20
  • Published : 2008.06.30

Abstract

Two dimensional road design is connoting danger factor because different point between design standard and driver's reaction. Consequently two dimensional road design is difficult to recognize problem that happen beforehand when before construction. Therefore three dimensional road design that can grasp problem after completion is required. In this study, three dimensional road was designed to evaluate road that is designed. Road designed by Inroad that is road design program. DTM is created using digital map and elevation data. Three dimensional road was designed by integrated DTM of road and topography. Road design evaluation was performed in three dimension. Driving simulation and sight distance assessment were carried out to estimate stability of alignment. Shadow simulation was executed on icy road section for bad section of icy road surface. As a result of evaluation, this study could confirm shape of road after completion. And sight distance could be calculated and visually confirmed. Also, icy road sections were extracted through shadow simulation.

2차원적인 도로설계는 설계기준과 운전자의 반응 사이에는 상이한 점이 많아 위험성을 내포하고 있다. 따라서 2차원 도로설계는 시공전에 예측을 하기가 어려운 실정이다. 그러나, 3차원 도로설계는 요구되는 구성요소의 완성 이후 발생하는 문제를 예측할 수 있다. 본 연구에서는, 실제도로에서 도로설계평가를 위하여 설계를 하였다. 그리고 도로설계는 Inroad를 라는 도로설계프로그램을 사용하였다. 또한, 수치지형도와 포고자료를 이용하여 DTM을 생성하였다. 3차원 도로설계는 도로의 DTM 과 지형자료를 합성하여 설계를 하였다. 3차원적으로 도로설계된 것을 이용하여 설계평가를 수행하였다. 도로선형의 안정성 평가를 위하여 운전자 시뮬레이션과 시거분석을 실시하였다. 그리고, 음영시뮬레이션을 통해 도로노면결빙구간의 불량구간을 추출하였다. 시뮬레이션 결과, 본 연구에서는 도로완공후의 모습을 확인할 수 있었다. 그리고 시거를 시각적으로 산정을 할 수 있었다. 또한 음영 시물레이션을 의해 도로노면결빙구간을 추출하였다.

Keywords