References
- 김석준, 이채영, '작업일정계획문제 해결을 위한 유전알고리듬의 응용,' 한국경영학회지, 제17권, 제3호(1992), pp.1-12
- Atwater, J.B. and Chakravorty, S.S., 'A study of the utilization of capacity constrained resources in drum-buffer-rope systems,' Production and Operations Management, Vol.11, No.2(2002), pp.259-269 https://doi.org/10.1111/j.1937-5956.2002.tb00495.x
- Feldmann, M. and Biskup, D., 'Single-machine scheduling for minimizing earliness and tardiness penalties by meta-heuristic approaches,' Computers and Industrial Engineering, Vol.44 (2003), pp.307-323 https://doi.org/10.1016/S0360-8352(02)00181-X
- Ghedjati, F., 'Genetic algorithms for the jobshop scheduling problem with unrelated parallel constraints:Heuristic mixing method machines and precedence,' Computers and Industrial Engineering, Vol.37(1999), pp.39-42 https://doi.org/10.1016/S0360-8352(99)00019-4
- Koonce, D.A. and Tsai, S.C., 'Using data mining to find patterns in genetic algorithm solutions to a job shop schedule,' Computers and Industrial Engineering, Vol. 38(2000), pp.361-374 https://doi.org/10.1016/S0360-8352(00)00050-4
- Kutanoglu, E. and Wu, S., 'Improving scheduling robustness via preprocessing and dynamic adaptation,' IIE transactions, Vol.36, No.11(2004), pp.1107-1124 https://doi.org/10.1080/07408170490500681
- Liu, J. and Tang, L., 'A modified genetic algorithm for single machine scheduling,' Computers and Industrial Engineering, Vol. 37(1999), pp.43-46 https://doi.org/10.1016/S0360-8352(99)00020-0
- Simons, J.V., Simpson, W.P., and Carlson, J.J., 'Formulation and solution of the drumbuffer- rope constraint scheduling problem (DBRCSP),' Int. J. of Production Research, Vol.34, No.(1996), pp.2405-2420 https://doi.org/10.1080/00207549608905035
- Simons, J.V., Stephens, M.D., and Simpson, W.P., 'Simultaneous versus sequential scheduling of multiple resources which constrain system throughput,' Int. J. of Production Research, Vol.37, No.1(1999), pp.21-33 https://doi.org/10.1080/002075499191896
- Srikanth M.L. and Umble, M.M., Synchronous management:profit-based manufacturing for the 21st century, The Spectrum Publishing Co. 1997
- Steele, D.C., Philipoom, P.R., Malhotra, M.K., and Fry, T.D., 'Comparison between drum-buffer-rope and material requirements planning:a case study,' Int. J. of Production Research, Vol.43, No.15(2005), pp.3181-3208 https://doi.org/10.1080/00207540500076704
- Uzsoy, R. and Wang, C. S., 'Performance of decomposition procedures for job shop scheduling problems with bottleneck machines,' Int. J. of Production Research, Vol.38, No.6(2000), pp.1271-1286 https://doi.org/10.1080/002075400188843
- Yu, H. and Liang, W., 'Neural network and genetic algorithm-based hybrid approach to expanded job-shop scheduling,' Computers and Industrial Engineering, Vol.39(2001), pp.337-356 https://doi.org/10.1016/S0360-8352(01)00010-9
- Wu, H.H. and Yeh, M.L., 'A DBR scheduling method for manufacturing environments with bottleneck re-entrant flows,' International Journal of Production Research, Vol.44, No.5(2006), pp.883-902 https://doi.org/10.1080/00207540500362187