과제정보
연구 과제 주관 기관 : 광운대학교
참고문헌
- Ann, Y. J. (2007), Six Sigma and Quality Management, Parkyoungsa, Seoul, Korea.
- Baker, K. R. and Su, Z. S. (1974), Sequencing with due-dates and early start times to minimize maximum tardiness, Naval Research Logistics Quarterly, 21, 171-176. https://doi.org/10.1002/nav.3800210112
- Everett, J. E. (2001), Iron ore production scheduling to improve product quality, European journal of operational research, 129(2), 355-361. https://doi.org/10.1016/S0377-2217(00)00233-2
- Flapper, S. D. P. and Teunter, R. H. (2004), Logistics planning of rework with deteriorating work-in-process, International journal of production economics, 88(1), 51-59. https://doi.org/10.1016/S0925-5273(03)00130-0
- Garey, M. R. and Johnson, D. S. (1979), Computers and intractability : A guide to the theory of NP completeness, San Francisco.
- Hayek, P. A., Salameh, M. K. (2001), Production lot sizing with the reworking of imperfect quality items produced, Production planning & control, 12(6), 584-590. https://doi.org/10.1080/095372801750397707
- H.Teunter, Ruud, Flapper, and Simme Douwe P. (2003), Lot-sizing for a single-stage single-product production system with rework of perishable production defectives, OR Spektrum : Organ der Deutschen Gesellschaft für Operations Research, 25(1), 85-96.
- Icmeli-Tukel, O. and Rom, W. O. (1997), Ensuring quality in resource constrained project scheduling, European journal of operational research, 103(3), 483-496. https://doi.org/10.1016/S0377-2217(96)00305-0
- Jamal, A. M. M., Sarker, B. R. and Mondal, S. (2004), Optimal manufacturing batch size with rework process at a single-stage production system, Computers & industrial engineering, 47(1), 77-89. https://doi.org/10.1016/j.cie.2004.03.001
- Juran, J. M. and Gryna, F. M. Jr. (1980), Quality Planning and Analysis 2nd ed, McGraw-Hill, New York.
- Kim, S. Y., Lee Y. H. and Agnihotri, D. (1995), A hybrid approach to sequencing jobs using heuristic rules and neural networks, Production Planning & Control, 6, 445-454. https://doi.org/10.1080/09537289508930302
- Kim S. C. and Bobrowski, P. M. (1994), Impact on sequence-dependent setup time on job shop scheduling performance, International Journal of Production Research, 32(7), 1503-1520. https://doi.org/10.1080/00207549408957019
- Liu, J. J., Ping, Y. (1996), Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs, European journal of operational research, 91(3), 517-527. https://doi.org/10.1016/0377-2217(94)00339-4
- Lee, Y. H., Bhaskran, K. and Pinedo, M. (1997), A heuristic to minimize the total weighted tardiness with sequence-dependent setups, IIE Transactions, 29, 45-52. https://doi.org/10.1080/07408179708966311
- Lee, Y. H. and Pinedo, M. (1997), Scheduling jobs on parallel machines with sequence-dependent setup times, European Journal of Operations Research, 100, 464-474. https://doi.org/10.1016/S0377-2217(95)00376-2
- Ovacik, I. M. and Uzsoy, R. (1994), Exploiting shop floor status information to schedule complex job shops, Journal of manufacturing systems, 13(2), 73-84. https://doi.org/10.1016/0278-6125(94)90023-X
- Ovacik, I. M. and Uzsoy, R. (1995), Rolling Horizon Procedures for dynamic parallel machine scheduling with sequence-dependent setup times, International Journal of Production Research, 33(11), 3173. https://doi.org/10.1080/00207549508904867
- Pinedo M and Chao X, (1999), Operations Scheduling with Applications in Manufacturing and Services, McGraw-Hill, New York. ISBN 0-07-289779-1.
- Schutten, J. M. J. and Leussink, R. A. M. (1996), Parallel machine scheduling with release dates, due dates and family setup times, International Journal of Production Economics, 46, 119-126. https://doi.org/10.1016/0925-5273(95)00086-0
- Uzsoy, R., Martin-Vega, L. A., Lee, C. Y. and Leonard, P. A. (1991), Production scheduling algorithms for a semiconductor test facility, IIE Transaction on Scheduling and Logistics, 4(4), 270-280.