참고문헌
- Akturk, M. S., Ghosh, J. B., and Gunes, E. D. (2003), Scheduling with Tool Changes to Minimize Total Completion Time : A Study of Heuristics and Their Performance, Naval Research Logistics, 50, 15-30 https://doi.org/10.1002/nav.10045
- Akturk, M. S., Ghosh, J. B., and Gunes, E. D. (2004), Scheduling with Tool Changes to Minimize Total Completion Time : Basic Results and SPT Performance, European Journal of Operational Research, 157, 784-790 https://doi.org/10.1016/S0377-2217(03)00232-7
- Chen, J. S. (2006a), Single-machine Scheduling with Flexible and Periodic Maintenance, Journal of Operational Research Society, 57, 703-710 https://doi.org/10.1057/palgrave.jors.2602043
- Chen, W. J. (2006b), Minimizing Total Flow Time in the Single-machine Scheduling Problem with Periodic Maintenance, Journal of Operational Research Society, 57, 410-415 https://doi.org/10.1057/palgrave.jors.2601998
- Graves, G. H. and Lee, C. Y. (1999), Scheduling Maintenance and Semi-resumable Jobs on a Single Machine, Naval Research Logistics, 46, 845-863 https://doi.org/10.1002/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#
- Ji, Min, He, Yong, and Cheng, T. C. E. (2007), Single-machine Scheduling with Periodic Maintenance to Minimize Makespan, Computers and Operations Research, 34, 1764-1770 https://doi.org/10.1016/j.cor.2005.05.034
- Kacem, I., Chu, C., and Souissi, A. (2008), Single-machine Scheduling with an Availability Constraint to Minimize the Weighted Sum of the Completion Times, Computers and Operations Research, 35, 827-844 https://doi.org/10.1016/j.cor.2006.04.010
- Lee, C. Y. (1996), Machine Scheduling with Availability Constraint, Journal of Global Optimization, 9, 395-416 https://doi.org/10.1007/BF00121681
- Lee, C. Y., Lei, L. and Pinedo, M. (1997), Current Trend in Deterministic Scheduling, Annals of Operations Research, 70, 1-41 https://doi.org/10.1023/A:1018909801944
- Lee, C. Y. and Leon, L. (2001), Machine Scheduling with a Rate-modifying Activity, European Journal of Operational Research, 128, 119-128 https://doi.org/10.1016/S0377-2217(99)00066-1
- Lee, C. Y. and Liman, S. D. (1992), Single-Machine Flow-time Scheduling with Scheduled Maintenance, Acta Inform, 29, 375-382 https://doi.org/10.1007/BF01178778
- Lee, C. Y. and Lin, C. S. (2001), Single-Machine Scheduling with Maintenance and Repair Rate-modifying Activity, European Journal of Operational Research , 135, 493-513 https://doi.org/10.1016/S0377-2217(00)00322-2
- Leon, C. J. and Wu, S. D (1992), On Scheduling with Ready-times, Duedates and Vacations, Naval Research Logistics, 39, 53-65 https://doi.org/10.1002/1520-6750(199202)39:1<53::AID-NAV3220390105>3.0.CO;2-C
- Leung, Joseph Y-T. (2004), Handbook of Scheduling, Chapman and Hall/CRC
- Liao, C. J. and Chen, W. J (2003), Single-machine Scheduling with Periodic Maintenance and Nonresumable Jobs, Computers and Operations Research, 30, 1335-1347 https://doi.org/10.1016/S0305-0548(02)00074-6
- Qi, X., Chen, T. and Tu, F. (1999), Scheduling the Maintenance on a Single Machine, Journal of Operational Research Society, 50, 1071-1078 https://doi.org/10.2307/3009932
- Sadfi, Cherif, Penz, Bernard, Rapine, Christophe, Blazewicz, Jacek and Formanowicz, Piotr. (2005), An Improved Approximation Algorithm for the Single Machine Total Completion Time Scheduling Problem with Availability Constraints, European Journal of Operational Research, 161, 3-10 https://doi.org/10.1016/j.ejor.2003.08.026
- Sanlaville, E. and Schimdt, G. (1998), Machine Scheduling with Availability Constraints, Acta Inform, 35, 795-811 https://doi.org/10.1007/s002360050143
- Schmidt, Günter (2000), Scheduling with Limited Machine Availability, European Journal of Operational Research, 121, 1-15 https://doi.org/10.1016/S0377-2217(98)00367-1
- Yang, D. L., Hung, C. L., Hsu, C. J. and Chern, M. S. (2002), Minimizing the Makespan in a Single Machine Scheduling Problem with a Flexible Maintenance, Journal of the Chinese Institute of Industrial Engineers, 19, 63-66 https://doi.org/10.1080/10170660209509183