References
- Dudek, G. (2004), Collaborative planning in supply chain: A negotiation-based approach, Springer.
- Graves, S. C. and Willems, S. P. (2003), Supply chain Design : Safety stock placement and supply chain configuration, in de Kok, A. G. and Graves, S. C (Eds.), Handbook in Operations Research and Management Science Vol.11, Elsevier, 95-132.
- Klose, A, Speranza, M. G. and Van Wassenhove, L. N. Eds. (2002), Quantitative approaches to Distribution logistics and supply chain management, Springer.
- Korkmazel, T. and Meral, S. (2001), Bicriteria sequencing methods for the mixed-model assembly line in just-intime production systems, European J. of Operational Research 131(1), 188-207. https://doi.org/10.1016/S0377-2217(00)00061-8
- Kotani, S. (1990), Analysis of Kanban System by the Exponential Smoothing Method, Proceedings of 1st APORS within IFORS, 305-318.
- Krajewski, L. J., King, B. E., Ritzman, L. P. and Wong, D. S. (1987). Kanban, MRP, and shaping the manufacturing environment, Management Science 33(1), 39-57. https://doi.org/10.1287/mnsc.33.1.39
- Kubiak, W. (1993), Minimizing variation of production rates in just-in-time systems : a survey, European J. of Operational Research 66, 259-271. https://doi.org/10.1016/0377-2217(93)90215-9
- Miltenburg, J. (1997), Comparing JIT, MRP and TOC, and embedding TOC into MRP, International Journal of Production Research 35(4), 1147-1169. https://doi.org/10.1080/002075497195597
- Monden, Y. (1998), Toyota Production System: An Integrated Approach to Just-In-Time, 3rd Ed., Engineering & Management Press.
- Spearman, M. L., Woodruff, D. L. and Hopp, W. J. (1990), CONWIP : A pull alternative of kanban, International Journal of Production Research 28(5), 879-894. https://doi.org/10.1080/00207549008942761
- Tamura, T., Kojima, M., Fujita, S. and Kumagai, C. (2005), An effectiveness of an exponentially smoothed ordering policy, Proceedings of Int. Conference on Operations and Supply Chain Management, Bali-Indonesia, B.1-B.8.
- Tamura, T., Dhakar, T. S., Ohno, K. and Kojima. M. (2006), Effectiveness of an Exponentially Smoothed Ordering Policy in a Multi-Stage Production System, Proceedings of the 7th Asia Pacific IE and Management Systems Conference 2006, Bangkok-Thailand, 1959-1970.