한국지열·수열에너지학회논문집 (Journal of the Korean Society for Geothermal and Hydrothermal Energy)
- 제4권2호
- /
- Pages.1-7
- /
- 2008
- /
- 2799-4783(pISSN)
- /
- 2799-4805(eISSN)
ISO 성능데이터를 이용한 지열히트펌프 시스템의 성능 확인 커미셔닝 기술
ISO performance data based commissioning technique for GSHP system
- Ko, Gun-Hyuk (Department of Mechanical Engineering, Cheju University) ;
- Kim, Ji-Young (Geothermal Energy Research Center, Korea Institute of Energy Research(KIER)) ;
- Kang, Eun-Chul (Geothermal Energy Research Center, Korea Institute of Energy Research(KIER)) ;
- Chang, Ki-Chang (Geothermal Energy Research Center, Korea Institute of Energy Research(KIER)) ;
- Lee, Euy-Joon (Geothermal Energy Research Center, Korea Institute of Energy Research(KIER))
- 발행 : 2008.12.01
초록
GSHP(Ground Source Heat Pump) has been extensively disseminated due to the recent increasing demand over new and renewable energy. However, the system reliability has been key issues and barriers to insure a better system performance as designed originally in ISO (international standard organization) standard. This paper introduces a systematic method to verify its intended design target so called as ISO performance data based commissioning technology for a water to air GSHP system. The commissioning technology starts from are to the international standard ISO performance data of a GSHP model and to compare its installed operation data and to calibrate and tune to the target optimum operation parameters. Results indicated that cooling capacity could be raised up to 76.6% from 46.6% from this proposed commissioning technology.
키워드