Abstract
In many construction projects, such as dams, highways, airports, buildings, industrial plants, and sewerage and drainage systems earthmoving operation is defined the movements of a certain quantity of earth to alter the surface configuration or conditions so that projects requirement can be met. Accurate calculation of travel time is essential for determining productivity of earthmoving operations, and for ultimately selecting the most cost-effective fleet configuration for executing the work. Also transportation work that utilizes dump truck consists average So in the whole expenses earthmoving operation, and is an important cost factor for cost management. Therefore this study proposes a methodology for optimum transfer speen based on the analysis of factors affecting earthmoving operation in different road types by collecting the sources of dump truck running speeds and considering the main factors affecting the earthmoving operation.
댐, 고속도로, 공항, 플랜트, 빌딩, 상하수도 처리장과 같은 많은 건설공사의 운반 작업이라 함은 프로젝트의 요구조건에 맞게 지면의 형상과 조건을 변형시키기 위하여 일정량의 토사를 운반하는 작업을 의미하며 흙 운반 작업의 정확한 이동시간의 계산은 작업의 생산성을 결정하고 궁극적으로 작업을 수행함에 있어 비용 효과적 인 장비배치를 위해 필수적인 요소라 할 수 있다. 그리고 덤프트럭을 활용한 운반 작업은 설계가 대비 평균 6%의 비용을 차지하고 있어 덤프트럭을 이용한 운반 작업은 공사비 관리 측면에서 중요한 비용 인자로 구분되어 관리해야 할 것이다. 따라서 본 연구에서는 현재 공사가 진행 중인 현장의 덤프트럭 주행속도의 자료 수집을 통하여 각 도로유형별 주행 속도에 영향을 미치는 요소를 파악하고 해당 도로유형별 영향요소를 고려한 도로유형 별 적정 주행 속도 산정에 관한 방법을 제시하고자 한다.