Abstract
The earth work has been improved with the utilization of capital intensive equipments. However, work performance is not satisfactory yet due to its experience-oriented characteristics in selecting the combination of earth work equipments. Therefore, it is required to study on appropriate and systematic methods in selecting a set of equipments for earth work in order to optimize the cost and time as well as to improve the productivity. The objectives of this paper are as followed : (1) developing an optimum combination model of earth work equipments by using a system dynamics technique. (2) testing and evaluating the model by the sample application to a case study. The research is limited to the work of excavating, loading and hauling. The suggested model is proved in practice, so it will assist engineers to make the proper decision for equipment planning of earth work.
건설공사의 초기 단계인 토공사의 경우 현장 토공계획에 부합하는 다양한 건설장비를 활용하여 수행된다. 이 경우 짧은 시간에 다종의 건설기계장비가 투입되며 많든 공사비가 소요되는 만큼 어느 공종보다도 토공관리자의 합리적인 계획 수립이 요구된다. 그러나 대부분의 경우 경험과 직관을 바탕으로 토공장비계획이 수립되어 공정관리 및 원가절감 차원에서 적절한지 검증이 어려우며, 계획수립에 요구되는 고려조건이 변경될 때마다 시간과 인력을 투입해야하는 실정이다. 이에 본 연구에서는 시스템 다이내믹스 기법을 활용하여 기계화 토공장비의 굴삭과 적재 및 운반단계를 대상으로 토공장비의 적정 조합모형을 구축한다. 연구의 결과로 도출되는 토공장비의 적정 조합모형은 토공계획을 담당하는 관리자가 토공장비계획을 함에 있어 짧은 시간에 합리적인 판단을 하도록 지원해줄 것으로 기대된다.