참고문헌
- Blackstone, J. H., Phillips, D. T. and Hogg, G. L. (1982), A State-of-the-art Survey of Dispatching Rules for Manufacturing Job Shop Operations, International Journal of Production Research, 20, 27-45. https://doi.org/10.1080/00207548208947745
- Bonney, M. C., Zhang, Z., Head, M. A., Tien, C. C. and Barson, R. J. (1999), Are Push and Pull Systems Really so Different? International Journal of Production Economics, 59, 53-64. https://doi.org/10.1016/S0925-5273(98)00094-2
- Buzacott, J. A. and Shantikumar, J. G. (1993), Stochastic Models of Manufacturing Systems, Prentice Hall, New York.
- Chan, W. T. and Hu, H. (2001), An Application of Genetic Algorithms to Precise Production Scheduling, Computers & Structures, 79, 1605-1616. https://doi.org/10.1016/S0045-7949(01)00036-0
- Chiadamrong N. and Limpasontipong, P. (2002), Using Storage Buffer to Improve Unbalanced Asynchronous Production Flow Line's Performance, International Journal of Manufacturing Technology and Management, 5(1-2), 149-161. https://doi.org/10.1504/IJMTM.2003.002538
- De Jong, K. A. (1975), An Analysis of the Behavior of a Class of Genetic Adaptive Systems, Ph.D. dissertation, University of Michigan.
- Ertay, T. (1998), Simulation Approach in Comparison of a Pull System in a Cell Production System with a Push System in a Conventional Production System According to Flexible Cost: A Case Study, International Journal of Production Economics, 56-57, 145-155. https://doi.org/10.1016/S0925-5273(98)00035-8
- Fu, M. C. (2002), Optimization for Simulation: Theory vs. Practice', Informs Journal on Computing, 14(3), 195-215.
- Geraghty, J. and Heavey, C. (2004), A Comparison of Hybrid Push/Pull and CONWIP/Pull Production Inventory Control Policies, International Journal of Production Economics, 91, 75-90. https://doi.org/10.1016/S0925-5273(03)00210-X
- Goldratt, E. M. (1991), Theory of Constraints, North River Press, Croton-on-Hudson, New York.
- Goldratt, E. M. (1992), The Gold: A Process of Ongoing Improvement, North River Press, Croton-on-Hudson, New York.
- Groover, M. P. (2001), Automation, Production System, and Computer-integrated Manufacturing, Prentice Hall, New Jersey.
- Hiller F. S. and Boling, R. W. (1977), On the Optimal Allocation of Work in Symmetrically Unbalanced Production Line Systems with Variable Operation Times, Management Sciences, 25, 721-728. https://doi.org/10.1287/mnsc.25.8.721
- Lambrecht M. and Segaert, A. (1990), Buffer Stock Allocation in Serial and Assembly Type of Production Lines, International Journal of Operations and Production Management, 10(2), 47-61.
- Lee, L. C. (1988), A Comparative Study of the Push and Pull Production Systems, International Journal of Production Management, 9(4), 5-18.
- Ozbayrak, M., Akgun M. and Turker, A. K. (2004), Activity- Based Cost Estimation in a Push/Pull Advanced Manufacturing System, International Journal of Production Economics, 87, 49-65. https://doi.org/10.1016/S0925-5273(03)00067-7
- Ou J. and Jiang, J. (1997), Yield Comparison of Push and Pull Control Methods on Production System with Unreliable Machines, International Journal of Production Economics, 50, 1-12. https://doi.org/10.1016/S0925-5273(97)89131-1
- Prasertwattana, K. and Chiadamrong, N. (2004) Purchasing and Inventory Policy in a Supply Chain under the Periodic Review: A Single Manufacturer and Multiple Retailers' Case, International Journal of Industrial Engineering and Management Systems, 3(1), 38-51.
- Powell, G. S. (1994), Buffer Allocation in Unbalanced Three-Station Serial lines, International Journal of Production Research, 32(9), 2201-2217.
- Sarker B. R. and Fitzsimmons, J. A. (1989), The Performance of Push and Pull Systems: A Simulation and Comparative Study, International Journal of Production Research, 27, 1715-1731. https://doi.org/10.1080/00207548908942650
- Smith, J. (1989), Learning Curve for Cost Control, Industrial Engineering and Management Press, Institute of Industrial Engineers, Norcross, Georgia.
- Wang, L., Zhang L., and Zheng, D. (2006), An Effective Hybrid Genetic Algorithm for Flow Shop Scheduling with Limited Buffer, Computers & Operations Research, 33, 2960-2971. https://doi.org/10.1016/j.cor.2005.02.028
- Yenradee, P. (1994), Performance Analysis of Push, Pull, and Detail-scheduling Systems in an Environment of Flow Shop, Workshop Seminar, Asian Institute of Technology, Bangkok, Thailand.