References
- Acton, L. P. and Park, R. E. (1987), Response to Timeof- Day electricity rates by large business customers: Reconciling Conflicting Evidence, Rand, R-3477- NSF.
- Aigner, D. J., Newman, J. and Tishler, A. (1994), The response of small and medium-size business customers to Time-of-Use (TOU) electricity rates in Israel, Journal of Applied Econometrics, 9, 283-304.
- Aigner, D. J. (1981), The residential electricity Time-of- Use pricing experiments: What have we learned? Chapter 1 in Hausman, J.A. and Wise D.A. (eds.), Social Experimentation, Chicago: University of Chicago Press.
- Aigner, D. J. and Gliali, K. (1989), Self-Selection in the residential electricity Time-of-Use pricing experiments, Journal of Applied Econometrics, 4, S131-S144. https://doi.org/10.1002/jae.3950040507
- Aigner, D. J. and Hirschberg (1985), Commercial and Industrial customer response to Time-of-Use electricity prices: Some experimental results, Rand Journal of Economics, 16, 341-355 https://doi.org/10.2307/2555562
- Albright, S. C., Winston, W. L. and Zappe, C. (1999), Data analysis and decision making with Microsoft Excel, Duxbury Press, USA.
- Behnezhad, A. L. and Khoshnevis, B. (1996), Integrate of machine requirement planning and aggregate production planning, Production Planning and Control, 7(3), 292-298. https://doi.org/10.1080/09537289608930355
- Candea, D. (1997), Issue of hierarchical planning in multistage production system, Technical Report No. 134, Operation Research Center, MIT, Cambridge, Mass.
- Caves, D. J., Herriges and Kuester, K. (1989), Load shifting under voluntary residential Time-of-Use rates. The Energy Journal, 10(4), 83-99.
- Coulbeck, B. and Orr, C. H. (1989), Dynamic programming for optimization of pump selection and scheduling in water supply system, Dynamic Programming for Optimal Water Resources System Analysis, A. Esogbue, ED., Prentice-Hall, Inc., Englewood Cliffs, N. J.
- Geerli, L. L., Chen and Yogoyama, R. (2001), Pricing and operation in deregulated electricity market by noncooperative game, Electric Power System Research, 57, 133-139. https://doi.org/10.1016/S0378-7796(01)00094-3
- Hamed, M. (2001), A correlative concept for the energy cost: A case study in Egypt, Electric Power System Research, 57, 49-57. https://doi.org/10.1016/S0378-7796(00)00115-2
- Ham, J., MOUNTAIN, D. and Chan, M. (1997), Timeof- Use prices and electricity demand: Allowing for selection bias in experimental data, RAND Journal of Economics, 28, S113-S141. https://doi.org/10.2307/3087458
- Harry, G. H. (1989) Least-Cost Electric Utility Planning, John Wiley & Sons, New York, USA.
- Hax, A. C. (1984), Aggregate production planning, Handbook of operation research, Van Nostrand Reinhold, New York.
- Henley, A. and Perison, J. (1994), Time-of-Use electricity pricing: Evidence from a British experiment. Economics Letters, 45, 421-426. https://doi.org/10.1016/0165-1765(94)90047-7
- Hoffman, A. J. and Jacobs, W. (1954), Smooth patterns of production, Management Science, 1(1), 86-91. https://doi.org/10.1287/mnsc.1.1.86
- Hop, N. V. and Tabucanon, M. T. (2000) Fuzzy multiattribute decision-making for grouping of electronic components in process planning, Production Planning & Control, 11(7), 677-688. https://doi.org/10.1080/095372800432142
- Jowitt, P. W. and Germanopoulos, G. (1992), Optimal pump scheduling in water supply networks. Journal of Water Resources Planning and Management, 118(4), 406-422. https://doi.org/10.1061/(ASCE)0733-9496(1992)118:4(406)
- Lee, S. M. (1972), Goal programming for decision analysis, Auerbach, Philadelphia.
- Leung, C. H., Wu, Y. and Lai, K. K. (2003), Multi-site aggregate production planning with multiple objectives: A goal programming approach, Production Planning and Control, 14(5), 425-436. https://doi.org/10.1080/0953728031000154264
- Leung, C. H. and Wu, Y. (2004), A robust optimization model for stochastic aggregate production planning, Production Planning and Control, 15(5), 502-514. https://doi.org/10.1080/09537280410001724287
- Park, R. E. and Acton, L. P. (1984), Large business customer response to Time-of-Day electricity rates, Journal of Econometrics, 26, 229-252. https://doi.org/10.1016/0304-4076(84)90019-8
- Provincial Electricity Authority of Thailand (PEA). (2000), Electricity charge rate, Provincial Electricity Authority of Thailand, Thailand.
- Schwarz, P. (1984), The estimated effects on industry of Time-of-Day demand and electricity prices, The Journal of Industrial Economics, 32, 529-539.
- Silva Filho, O. S. (1999), An aggregate production planning model with demand under uncertainty, Production Planning and Control, 10(8), 745-756. https://doi.org/10.1080/095372899232579
- Steuer, R. E. (1985), Multiple-criteria optimization: theory, computation, and mathematical statistic-applied, Wiley, New York.
- Techawiboonwong, A. and Yenradee, P. (2002), Aggregate production planning using spreadsheet solver: Model and case study, Science Asia, 28(3), 291-300. https://doi.org/10.2306/scienceasia1513-1874.2002.28.291
- Techawiboonwong, A. and Yenradee, P. (2003), Aggregate production planning with workforce transferring plan for multiple product types. Production Planning & Control, 15(5), 447-458.
- Tishler, A. and Lipovestsky, S. (1997), The flexible CESG13C family of cost functions: derivation and application. Review of Economics and Statistics, 79, 638-646. https://doi.org/10.1162/003465397557042
- Train, K. and Mehrez, G. (1994), Optional Time-of-Use prices for electricity: Econometric analysis of surplus and Parato impacts, RAND Journal of Economics, 25, 263-283. https://doi.org/10.2307/2555830
- Tsay, M. T. and Lin, W. M. (2000), Application of evolution programming to optimal operational strategy co-generation system under Time-of-Use rates, Electric Power and Energy System, 22, 367-373. https://doi.org/10.1016/S0142-0615(99)00067-8
- Vilas, N., Elaine, C. S. and Rafael, G. O. (1996), Optimization of water supply system operation, Journal of Water Resources Planning and Management, Sep/Oct, 374-384.
- Wang, R. C. and Fang, H. H. (2001), Aggregate production planning with multiple objectives in a fuzzy environment, European Journal of Operation Research, 133, 512-536. https://doi.org/10.1016/S0377-2217(00)00195-8
- Wang, R. C. and Fang, H. H. (2001), Aggregate production planning with fuzzy variables, International Journal of Industrial Engineering-Theory, Applications, and Practices, 8, 37-44.
- Winston, W. L. (1994), Operation research: Applications and algorithms (3rd edn.), Duxbury Press, California.
- Woo, C. (1985) Demand for electricity of small nonresidential customers under Time-of-Use (TOU) pricing, The Energy Journal, 6(4), 115-127.
- Yu, P. (1985) Multiple-criteria decision making, Plenum Press, New York.