참고문헌
- Abdelsalam, H. and Bao, H. (2006), A simulation-based optimization frame-work for product development cycle time reduction, IEEE Transactions on Engineering Management, 53(1), 69-85
- Adler, P., Mandelbaum, A., Nguyen, V., and Schwerer, E. (1995), From project to process management: An empirically-based framework for analyzing product development time, Management Science, 41(3), 458-484 https://doi.org/10.1287/mnsc.41.3.458
- Ahmadi, R., Roemer, T., and Wang, R. (2001), Structuring product development processes, European Journal of Operational Research, 130(3), 539-558 https://doi.org/10.1016/S0377-2217(99)00412-9
- Anavi-Isakow, S. and Golany B. (2003), Managing multi-project environments through constant work-in-process, International Journal of Project Management, 21(1), 9-18 https://doi.org/10.1016/S0263-7863(01)00058-8
- Browning, T. and Eppinger, S. (2002), Modeling impats of process architecture on cost and schedule risk in product development, IEEE Transactions on Management, 49(4), 428-442 https://doi.org/10.1109/TEM.2002.806709
- Cho, S. and Eppinger, S. (2006), A simulation-based process model for managing complex design design projects, IEEE Transactions on Engineering management, 52(3), 316-328
- Cohen, J., Golany, B. and Shtub, A. (2005), Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology, Annals of Operations Research, 134(1), 183-199 https://doi.org/10.1007/s10479-005-5730-1
- Elonen, S. and Artto K. (2003), Problems in managing internal development projects in multi-project environments. International Journal of Project Management, 21(6), 395-402 https://doi.org/10.1016/S0263-7863(02)00097-2
- Eppinger, S., Whitney, D., Smith R., and Gebala, D. (1994), A model-based method for organizing tasks in product development, Research in Engineering Design, 6(1), 1-13 https://doi.org/10.1007/BF01588087
- Krishnan, V., Eppinger, S., and Whitney, D. (1997), A model-based framework to overlap product development activities, Management Science, 43(4), 437-451 https://doi.org/10.1287/mnsc.43.4.437
- Murty, K. (1995), Operations research: Deterministic optimization models, Prentice Hall, Englewood Cliffs
- Narahari, Y., Viswanadham, N., and Kumar, V. (1999), Lead time modeling and acceleration of product design and development. IEEE Transactions on robotics and automation, 15(5), 882-896 https://doi.org/10.1109/70.795793
- Roemer, T., Ahmadi R., and Wang, R. (2000), Time-costtrade-offs in overlapped product development, Operations Research, 48(6), 858-865 https://doi.org/10.1287/opre.48.6.858.12396
- Roemer, T. and Ahmadi R. (2004), Concurrent crashing and overlapping in product development, Operation: Research, 52(4), 606-622 https://doi.org/10.1287/opre.1040.0125
- Smith, R. and Eppinger, S. (1993), Charateristics and models of iteration in engineering design, International Conference on Engineering Design, The Hague, Netherlands, 17-19, August
- Smith, R. and Eppinget, S. (1997a), Identifying controlling featues fo engineering design iteration, Management Science, 43(3), 276-293 https://doi.org/10.1287/mnsc.43.3.276
- Smith, R. and Eppinger, S. (1997b), Apredictive model of sequential iteration in engineering design, Management Science, 43(8), 1104-1120 https://doi.org/10.1287/mnsc.43.8.1104
- Ulich, K. and Eppinger, S. (2003), Product design and development, McGraw- Hill, NewYork
- Wheelwright, S. and Clark, K. (1992), Creating project plans to focus product development, Harvard Business Review, 70(2), 70-82