A Case Study on the Change of Space Organization of School Facilities on the Design Planning Step - By Analyzing on the Plan of Schools by PFI -

설계단계별 학교시설의 공간구성 변화에 관한 사례 연구 - 민간투자사업 대상 학교의 도면 분석을 통하여 -

  • Published : 2007.10.30

Abstract

The present research has been conducted on the arranged form, the number and kinds, the area, the location of the rooms and the variation on exterior designs, based on a layout and a ground plan of each step, which are general plan, VE proposal and the final negotiation, for 11 elementary and middle and high schools that are designed in the way of BTL project. In consequence, it has been found out that there are some changes in the number and position of the rooms. However, the changes are not exceeding the overall arrangement form. This could not have led to the original aim, which is to induce creativity by PFI. It can be supposed that it is because the BTL system is stick to the old process, the method of financial investment and it is true to say that there needs to be solution for that.

Keywords

References

  1. 류호섭 외 1인, 설계수준 향상을 위한 교육시설 기획 및 설계과정에 관한 연구/기획으로부터 설계까지의 소요기간 현황파악을 중심으로, 한국교육시설학회지 12권 6호, 2005
  2. 교육인적자원부, 2006년 BTL사업 집행 지침(안), 2006
  3. 교육인적자원부, BTL사업 추진 실적 및 향후 일정, 2006
  4. 교육인적자원부, 2007년 교육시설 BTL사업계획(안), 2007
  5. 특집 민간투자사업에 의한 교육시설 발전방향, 한국교육시설학회지, 13권 3호, 2006
  6. 특집 민간투자사업 BTL 교육시설 전망, 대한건축학회지, 50권 2호, 2006