Abstract
To overcome the limits of the static pile load test for large diameter drilled shafts, bi-directional low pressure pile load test (BDL PLT) has been used but this test method containes some problems that has not been solved basically. That is, BDL PLT has some problems: difficulty in jack (or cell) arrangement for large test capacity, void remain inside jack (or cell) due to the unrecovery of piston after test etc. In this study, bi-directional double-acting high pressure pile load test (BDH PLT W/DOJ) was developed and confirmed for a in-situ large diameter drilled shaft. At present, test specification of bi-directional pile load test (BDPLT) is being made, and severed main issues (such as, test kinds, test capacity, necessity of use of double-acting and attention of application to service pile) will be contained at the specification.
대구경 현장타설말뚝에 대한 정재하시험의 한계를 극복하기 위하여 양방향 저압 말뚝재하시험이 개발되어 사용되어오고 있으나 이 방법 또한 근원적으로 해결되지 않은 문제점을 내포하고 있다. 즉, 양방향 저압 말뚝재하시험은 대용량 실린더의 배치곤란 및 시험 종료 후 실린더의 미복원에 따른 장치 내 빈 공간잔류 등의 문제점을 내포하고 있다. 본 연구에서는 양방향 복동식 고유압 말뚝재하시험(BDH PLT ; Bi-directional High Pressure Pile Load Test)을 개발하였으며 실제 현장에서 시행된 사례를 분석하여 양방향 복동식 고유압 말뚝재하시험에 대한 적용성을 확보하였다. 현재 양방향 말뚝재하시험 규정이 제정 중에 있으며, 시험종류, 재하용량, 복동식 잭 사용 필요성, 사용말뚝에 적용 시 주의점 등의 주요개념이 포함될 것이다.