References
- R. He, X.-W. Liu, Z.-J. Zhang, and D.-S. Shen, Characteristics of the Bioreactor Landfill System using an Anaerobicaerobic Process for Nitrogen Removal, Bioresource Tech, 98(3), 2526 (2007) https://doi.org/10.1016/j.biortech.2006.09.013
- G. Zhu, Y. Peng, S. Wang, S. Wu, and B. Ma, Effect of Influent Flow Rate Distribution on the Performance of Step-feed Biological Nitrogen Removal Process, Chem. Eng. J., 131(1-3), 319 (2007) https://doi.org/10.1016/j.cej.2006.11.020
- J. Guo, Q. Yang, Y. Peng, A. Yang, and S. Wang, Biological Nitrogen Removal with Real-time Control using Step-feed SBR Technology, Enzyme Microbial Tech, 40(6), 1564 (2007) https://doi.org/10.1016/j.enzmictec.2006.11.001
- U.S. EPA, 'Manual Nitrogen Control', U.S. EPA, Washington (1993)
- N. J. Joran, P. Lowe, and ED I. Stentiford, 'Nutrient Removal from Wastewaters', Technomic, Lancaster (1994)
- M. Henze, C. P. L. Grady, W. Gujer, GvR. Marais, and T. Matsuo, 'Activated Sludge Model No. 1. IAWQ Scientific and Technical Report No.1,' P. 33, IAWQ, London (1987)
- M. Henze, W. Gujer, T. Mino, T. Matsuo, M. Wentze, GvR. Marais, and MCM. Loosdrecht, Activated Sludge Model No. 2d., Wat. Sc. Tech, 39(1), 165 (1999)
- J. S. Huang, C. C. Tsai, H. H. Chou, and W. H. Ting, Simulation Modeling for Nitrogen Removal and Experimental Estimation of Mass Fractions of Microbial Groups In Single-sludge System, Chemosphere, 62(1), 61 (2006) https://doi.org/10.1016/j.chemosphere.2005.04.013
- B.-D. Lee, and K-H. Cheong, Verification of Biological Nitrogen Removal Model in Anoxic-oxic Process, J. Environ. Sci., 14(2), 1155 (2005) https://doi.org/10.5322/JES.2005.14.12.1155
- B.-D. Lee, Modeling for Biological Nitrogen Removal in Step-Feed Process, J. Kor. Oil Chem. Soc., 22(1), 62 (2005)
- M. A. Z. Coelho, C. Russo, and O. Q. F. Araujo, Optimization of a Sequencing Batch Reactor for Biological Nitrogen Removal, Wat. Res., 34(10), 2809 (2000) https://doi.org/10.1016/S0043-1354(00)00010-5
- G. Koch, M. Kuhni, and H. Siegrist, Calibration and Validation of an ASM3-based Steady-state Maciel for Activated Sludge Systems - part I: Prediction of Nitrogen Removal and Sludge Production. Wat. Res., 35(9), 2235 (2001) https://doi.org/10.1016/S0043-1354(00)00514-5
- J. Makinia, and S. A. Wells, A General Model of the Activated Sludge Reactor with Dispersive Flow-I. Model Development and Parameter Estimation, Wat. Res., 34(16), 3987 (2000) https://doi.org/10.1016/S0043-1354(00)00150-0
- S. C. F. Meijer, M. C. M. van Loosdrecht and J. J. Heijnen, Modelling the Start-up of a Full-scale Biological Phosphorous and Nitrogen Removing WWTP, Wat. Res., 36(19), 4667 (2002) https://doi.org/10.1016/S0043-1354(02)00192-6
- J. Can-era, J. A. Baeza, T. Vicent, and J. Lafuente, Biological Nitrogen Removal of High-strength Ammonium Industrial Wastewater with Two-sludge System, Wat. Res., 37(17), 4211 (2003) https://doi.org/10.1016/S0043-1354(03)00338-5
- B.S. Akin, and A. Ugurlu, Monitoring and Control of Biological Nutrient Removal in a Sequencing Batch Reactor, Process Biochem., 40(8), 2873 (2005) https://doi.org/10.1016/j.procbio.2005.01.001
- S. Chakraborty, and H. Veeramani, Effect of HRT and Recycle Ratio on Removal of Cyanide, Phenol, Thiocyanate and Ammonia in an Anaerobic - anoxic aerobic Continuous System, Process Biochem., 41(1), 96 (2006) https://doi.org/10.1016/j.procbio.2005.03.067
- G. Ruiz, D. Jeison, O. Rubilar, G. Ciudad, and R. Chamy, Nitrification denitrification via Nitrite Accumulation for Nitrogen Removal from Wastewaters, Bioresource Tech, 97(2), 330 (2006) https://doi.org/10.1016/j.biortech.2005.02.018
- Taelim Industry Co., 'Biological Nitrogen Removal Process for Hodong Landfill Leachate', Pohang, (2003)