참고문헌
- ACI (1963), Building Code Requeriments for Reinforced Concrete (ACI 318-63), American Concrete Institute, Detroit, MI
- ACI (2005), Building Code Requeriments for Reinforced Concrete (ACI 318-05), American Concrete Institute, Fannington Hills. MI
- AENOR (1997), UNE 36094: Alambres y cordones de acero para armaduras de hormigon pretensado, Asociacion Espanola de Normalizacion y Certificacion, Madrid. (spanish text)
- Balazs, G. (1992), 'Transfer control of prestressing strands', PCI J., 37(6), 60-71 https://doi.org/10.15554/pcij.11011992.60.71
- Balazs, G. (1993) 'Transfer length of prestressing strand as a function of draw-in and inicial prestress', PCI J., 38(2), 86-93 https://doi.org/10.15554/pcij.03011993.86.93
- Barnes, R.W., Grove, J.W. and Burns, N.H. (2003), 'Experimental assessment of factors affecting transfer length', ACI Struct. J., 100(6), 740-748
- Brearley, L.M. and Johnston, D.W. (1990), 'Pull-out bond tests of epoxy-coated prestressing strand', J. Struct. Eng., ASCE, 116(8), 2236-2252 https://doi.org/10.1061/(ASCE)0733-9445(1990)116:8(2236)
- Bruggeling, A.S.G. and Huyghe, G.F. (1991), Prefabrication with Concrete, Ed. A.A. Balkema/Rotterdam/Brookfield, Netherlands
- Buckner, C.D. (1995), 'A review of strand development length for pretensioned concrete members', PCI J., 40(2),84-105 https://doi.org/10.15554/pcij.03011995.84.105
-
CEB (1987), Anchorage Zones of Prestressed Concrete Members, Bulletin d'Infonnation
$N^\circ$ 181, Comite EuroInternational du Beton, Lausanne, Switzerland -
CEB-FIP (1990), CEB-FIP Model Code 1990 (MC90), Bulletin d'Infonnation
$n^\circ$ 213/214, Comite EuroInternational du Beton and Federation Internationale de la Precontrainte, Lausanne, Switzerland - CEN (1991), Eurocode 2: Design of Concrete Structures - Part 1-1: General Rules and Rules for Buildings, European prestandard ENV 1992-1-1: 1991, Comite Europeen de Nonnalisation, Brussels, Belgium
- CEN (2000), Cement. Part 1: Compositions, Specifications and Conformity Criteria for Common Cements, European standard EN 197-1:2000, Comite Europeen de Nonnalisation, Brussels, Belgium
- CEN (2004), Eurocode 2: Design of Concrete Structures - Part 1-1: General Rules and Rules for Buildings, European standard EN 1992-1-1 :2004:E, Comite Europeen de Nonnalisation, Brussels, Belgium
- Chen, H. and Wissawapaisal, K. (2001), 'Measurement of tensile forces in a seven-wire prestressing strand using stress waves', J. Eng Mech., ASCE, June, 599-606
- Cousins, Th. E., Johnston, D.W. and Zia, P. (1990), 'Transfer and development length of epoxy-coated and uncoated prestressing strand', PCI J., 35(4), 92-103 https://doi.org/10.15554/pcij.07011990.92.103
- Deatherage, J.H., Burdette, E. and Chew, Ch.K. (1994), 'Development length and lateral spacing requirements of prestressing strand for prestressed concrete bridge girders', PCI J., 39(1), 70-83
- den Uijl, J.A. (1998), Bond Modelling of Prestressing Strand. Bond and development of reinforcement, SP 180-7, ACI International, Farmington Hills. MI
- Evans, R.H. and Robinson, W.R. (1955), 'Bond stresses in prestressed concrete from x-ray photographs', P. I. Civil Eng PT l, 6(14), 212-235
-
FIB (2000), Bond of Reinforcement in Concrete. State of the Art Report, Bulletin d'Information
$n^\circ$ 10, Federation Internationale du Beton, Lausanne, Switzerland - Fu, X. and Chung, D.D.L. (1998), 'Effects of water-cement ratio, curing age, silica fume, polymer admixtures, steel surface treatments, and corrosion on bond between concrete and steel reinforcing bars', ACI Mater. J., 95(6), 725-734
- Guyon, Y. (1953), Beron precontrainte. Etude theorique et experimentale, Ed. Eyrolles, Paris, France
- Janney, J. (1954), 'Nature of bond in pretensioned prestressed concrete', ACI J., 25(9), 717-737
- Linger, D.A. and Bhonsle, S.R. (1963), 'An investigation of transfer length in pretensioned concrete using photoelasticity', PCI J., 8(4), 13-30 https://doi.org/10.15554/pcij.08011963.13.30
- Mahmoud, Z.I., Rizkalla, S.H. and Zaghloul, E.R. (1999), 'Transfer and development lengths of carbon fiber reinforcement polymers prestressing reinforcing', ACl Struct. J., 96(4), 594-602
- Marti, J.R. (2003), Experimental Study on Bond of Prestressing Strand in High-strength Concrete, PhD Thesis, Polytechnic University of Valencia, ProQuest Information and Learning Company, UMI Number 3041710, MI. (spanish text)
- Marti-Vargas, J.R., Serna-Ros, P., Femandez-Prada, M.A., Miguel-Sosa, P.F. and Arbelaez, C.A. (2006), 'Test method for determination of the transmission and anchorage lengths in prestressed reinforcement', Mag. Concrete Res., 58(1), 21-29 https://doi.org/10.1680/macr.2006.58.1.21
- Mitchell, D., Cook, W.D., Khan, A. and Tham, T. (1993), 'Influence of high strength concrete on transfer and development length ofpretensioning strand', PCI J., 38(3), 52-66
- Nanni, A., Utsunomiya, T., Yonekura, H. and Tanigaki, M. (1992), 'Transmission of prestressing force to concrete by bonded fiber reinforced plastic tendons', ACl Struct. J., 89(3), 335-344
- Nijhawam, J.C. (1978), Discussion of 'Development length ofprestressing strand', PCI J., 23(4), 97-107
- Olesniewicz, A. (1975), Statistical Evaluation of Transmission Length of Strand, Research and design Centre for Industrial Building (BISTYP), Varsaw, Poland
- Ratz, E.H., Holmjanski, M.M. and Kolner, V.M. (1958), 'The trasnsmission of prestress to concrete by bond', Proceedings of '58 Federation 1nternationale de la Precontrainte Congress, Berlin, 624-640
- Russell, B.W and Burns, N.H. (1996), 'Measured transfer lengths of 0.5 and 0.6 in. strands in pretensioned concrete', PCI J., 41(5), 44-65
- Shahawy, M. (2001), 'A critical evaluation of the AASHTO provisions for strand development length of prestressed concrete members', PCI J., 46(4), 94-117 https://doi.org/10.15554/pcij.07012001.94.117
- Shahawy, M., Moussa, I. and Batchelor, B. (1992), 'Strand transfer lengths in full scale aashto prestressed concrete girders', PCI J., 37(3), 84-96
- Tabatabai, H. and Dickson, Th. (1993), 'The history of the prestressing strand development length equation', PCI J., 38(5), 64-75
- Tadros, M.K. and Baishya, M.C (1996), Discussion of 'A review of strand development length for pretensioned concrete members', PCI J., 41(2), 112-127
- Thorsen, N. (1956), 'Use of large tendons in pretensioned concrete', ACI J., Feb., 649-659
- Zia, P. and Mostafa, T. (1977), 'Development length of prestressing strands', PCI J., 22(5), 54-65 https://doi.org/10.15554/pcij.09011977.54.65
피인용 문헌
- A higher-order equation for modeling strand bond in pretensioned concrete beams vol.131, 2017, https://doi.org/10.1016/j.engstruct.2016.10.050
- Predicting Strand Transfer Length in Pretensioned Concrete: Eurocode versus North American Practice vol.18, pp.12, 2013, https://doi.org/10.1061/(ASCE)BE.1943-5592.0000456
- Predicting bond formulations for prestressed concrete elements vol.97, 2015, https://doi.org/10.1016/j.engstruct.2015.04.013
- Correlation of Strand Surface Quality to Transfer Length vol.111, pp.5, 2014, https://doi.org/10.14359/51686925
- Effects of confinement and concrete nonlinearity on transfer length of prestress in concrete vol.11, 2017, https://doi.org/10.1016/j.istruc.2017.04.002
- Prestress losses evaluation in prestressed concrete prismatic specimens vol.48, 2013, https://doi.org/10.1016/j.engstruct.2012.11.038
- Prediction of the transfer length of prestressing strands with neural networks vol.12, pp.2, 2013, https://doi.org/10.12989/cac.2013.12.2.187
- Discussion of “Development Length Tests of Full-Scale Prestressed Self-Consolidating Concrete Box and I-Girders” by Bassem Andrawes, Andrew Pozolo, and Zhe Chen vol.20, pp.4, 2015, https://doi.org/10.1061/(ASCE)BE.1943-5592.0000703
- Discussion: Pull-out and push-in tests of bonded steel strands vol.65, pp.18, 2013, https://doi.org/10.1680/macr.13.00061
- Strand bond performance in prestressed concrete accounting for bond slip vol.51, 2013, https://doi.org/10.1016/j.engstruct.2013.01.023
- Discussion of “Efficient Prestressed Concrete-Steel Composite Girder for Medium-Span Bridges. II: Finite-Element Analysis and Experimental Investigation” by Yaohua Deng and George Morcous vol.20, pp.6, 2015, https://doi.org/10.1061/(ASCE)BE.1943-5592.0000711
- Time-dependent evolution of strand transfer length in pretensioned prestressed concrete members vol.17, pp.4, 2013, https://doi.org/10.1007/s11043-012-9200-2
- Effects of concrete composition on transmission length of prestressing strands vol.27, pp.1, 2012, https://doi.org/10.1016/j.conbuildmat.2011.07.038
- Discussion of “Performance of an AASHTO Beam Bridge Prestressed with CFRP Tendons” by Nabil Grace, Elin Jensen, Vasant Matsagar, and Prasadu Penjendra vol.19, pp.3, 2014, https://doi.org/10.1061/(ASCE)BE.1943-5592.0000504
- Effect of concrete compressive strength on transfer length vol.5, 2016, https://doi.org/10.1016/j.istruc.2015.10.006
- Development Length Tests of Full-Scale Prestressed Self-Consolidating Concrete Box and I-Girders vol.18, pp.11, 2013, https://doi.org/10.1061/(ASCE)BE.1943-5592.0000363
- Influence of concrete composition on anchorage bond behavior of prestressing reinforcement vol.48, 2013, https://doi.org/10.1016/j.conbuildmat.2013.07.102
- Slip distribution model along the anchorage length of prestressing strands vol.59, 2014, https://doi.org/10.1016/j.engstruct.2013.11.032
- Experimental Technique for Measuring the Long-term Transfer Length in Prestressed Concrete vol.49, pp.2, 2013, https://doi.org/10.1111/str.12019
- Transfer length of 2400 MPa seven-wire 15.2 mm steel strands in high-strength pretensioned prestressed concrete beam vol.17, pp.4, 2016, https://doi.org/10.12989/sss.2016.17.4.577
- Measured Transfer Lengths of 0.7 in. Strands for Pretensioned Beams vol.113, pp.1, 2016, https://doi.org/10.14359/51687941
- Measuring specific parameters in pretensioned concrete members using a single testing technique vol.49, 2014, https://doi.org/10.1016/j.measurement.2013.12.007
- Bond Behavior of Pretensioned Strand Embedded in Ultra-High-Performance Fiber-Reinforced Concrete vol.12, pp.1, 2018, https://doi.org/10.1186/s40069-018-0249-4
- Modelos de transferencia del pretensado: análisis comparativo vol.65, pp.272, 2007, https://doi.org/10.1016/s0439-5689(14)70002-6
- Transfer length in full-scale pretensioned concrete beams with 1.4 m and 2.4 m section depths vol.171, pp.None, 2018, https://doi.org/10.1016/j.engstruct.2018.05.104
- Development and application of a hybrid prestressed segmental concrete girder utilizing low carbon materials vol.69, pp.4, 2007, https://doi.org/10.12989/sem.2019.69.4.371
- Transmission length of pretensioned concrete systems - comparison of codes and test data vol.71, pp.17, 2019, https://doi.org/10.1680/jmacr.17.00553
- Effect of Elevated Temperature on the Bond Strength of Prestressing Reinforcement in UHPC vol.13, pp.21, 2020, https://doi.org/10.3390/ma13214990