Abstract
Seismic performance evaluation for dam safety evaluation has been continually conducted. However the behavior analysis for the spillway pier which is known as the weak point of dam is seldom reported. Therefore, this study performed the static loading tests for a prototype structures as elementary tests for the final seismic performance evaluation of dam safety. The prototype of pier structure has 1/20 scale and it adopts to strength model. And cracking loads and ultimate loads of real structures are calculated through numerical analysis using commercial FEM program (ABAQUS). The results of this study show some difference between the results of prototype tests and the results of numerical analysis. Also, the ultimate and cracking loads can be estimated through the prototype loading test and numerical analysis.
댐 안전성 평가를 위한 내진성능평가는 지속적으로 실시하였으나, 댐에서 취약부로 알려진 여수로 피어부에 대한 거동 분석에 대한 연구는 거의 이루어지지 않았다. 실제 지진발생시 여수로 피어가 국부 손상을 받기에 취약한 부분으로 추정되어 본 연구에서 댐의 내진성능 평가를 위한 기초 실험으로서 정적 시험을 수행하였다. 본 연구에서는 댐의 여수로 피어부에 대한 축소된 철근콘크리트 모형을 통한 강도모델을 구성하여 정적 모형 시험을 실시하고, 시험 결과의 분석, 구조해석을 통한 실제 구조물의 거동 및 균열하중, 극한하중에 대한 분석을 실시하였다. 대상 시험체에 대한 모형 시험 결과와 수치해석 결과는 서로 다른 파괴 거동을 나타내어 파괴하중이 서로 다르게 추정되었으나, 모형 시험체의 파괴 거동을 고려하는 경우에는 정적 시험과 해석을 통하여 실제 구조물의 균열 발생 하중과 극한하중을 추정할 수 있는 것으로 사료된다.