참고문헌
- Ahmadi, R., U. Bagchi, and T. A. Roemer, "Coordinated Scheduling of Customer Orders for Quick Response," Naval Research Logistics 52 (2005), 493-512 https://doi.org/10.1002/nav.20092
- Baker, K. R., "Scheduling the Production of Components at a Common Facility," IIE Transactions 20 (1988), 32-35 https://doi.org/10.1080/07408178808966147
- Blocher, J. D. and D. Chhajed, "The Customer Order Lead Time Problem on Parallel Machines," Naval Research Logistics 43 (1996), 629-654 https://doi.org/10.1002/(SICI)1520-6750(199608)43:5<629::AID-NAV3>3.0.CO;2-7
- Blocher, J. D., D. Chhajed, and M. Leung, "Customer Order Scheduling in a General Job Shop Environment," Decision Science 29 (1998), 951-981 https://doi.org/10.1111/j.1540-5915.1998.tb00883.x
- Bruno, J., E. G. Coffman and R. Sethi, "Scheduling Independent Tasks to Reduce Mean Finishing Time," Communications of the ACM 17 (1974), 382-387 https://doi.org/10.1145/361011.361064
- Coffman, E. G., A. Nozari, and M. Yannakakis, "Optimal Scheduling of Products with Two Subassemblies on a Single Machine," Operations Research 37 (1989), 426-436 https://doi.org/10.1287/opre.37.3.426
- Ding, F. Y., "A Pairwise Interchange Solution Procedure for a Scheduling Problem with Production of Components at a Single Facility," Computers and Industrial Engineering 18 (1990), 325-331 https://doi.org/10.1016/0360-8352(90)90054-P
- Gerodimos, A. E., C. A. Glass, and C. N. Potts, "Scheduling the Production of Two-Component Jobs on a Single Machine," European Journal of Operational Research 120 (2000), 250-259 https://doi.org/10.1016/S0377-2217(99)00154-X
- Graham, R. L., "Bounds on Multiprocessing Timing Anomalies," SIAM Journal on Applied Mathematics 17 (1969), 416-429 https://doi.org/10.1137/0117039
- Graham, R. L., E. L. Lawler, J. K. Lenstra, and A. H. G. Rinnooy Kan, "Optimization and Approximation in Deterministic Machine Scheduling: A Survey," Annals of Discrete Mathematics 5 (1979), 287-326 https://doi.org/10.1016/S0167-5060(08)70356-X
- Gupta, J. N. D., J. C. Ho, and A. A. van der Veen, "Single Machine Hierarchical Scheduling with Customer Orders and Multiple Job Classes," Annals of Operations Research 70 (1997), 127-143 https://doi.org/10.1023/A:1018913902852
- Julien, F. M. and M. J. Magazine, "Scheduling Customer Orders: An Alternative Production Scheduling Approach," Journal of Manufacturing and Operations Management 3 (1990), 177-199
- Liao, C. J., "Optimal Scheduling of Products with Common and Unique Components," International Journal of Systems Science 27 (1996), 361-366 https://doi.org/10.1080/00207729608929225
- Roemer, T. A. and R. Ahmadi, "Complexity of Scheduling Customer Orders," Working Paper, Anderson School at UCLA (1997), USA
- Santos, C. and M. Magazine, "Batching in Single Operation Manufacturing Systems," Operations Research Letters 4 (1985), 99-103 https://doi.org/10.1016/0167-6377(85)90011-2
- Yang, J., "The Complexity of Customer Order Scheduling Problems on Parallel Machines," Computers and Operations Research 32 (2005), 1921-1939 https://doi.org/10.1016/j.cor.2003.12.008
- Yang, J. and M. E. Posner, "Scheduling Parallel Machines for the Customer Order Problem," Journal of Scheduling 8 (2005), 49-74 https://doi.org/10.1007/s10951-005-5315-5