References
- COO-20070108-020 CDG Ultra Mobile Broadband, January 2007
- C30-20060731-040, 'Joint Proposal for 3GPP2 Physical Layer for FDD Spectra" ,July 2006.
- Coo-20070827-108C.P0084 v2.0, "Physical Layer for Ultra Mobile Broadband (UMB) Air Interface Specification" , August 2007
- COO-20070827-113_C.P0084 v2.0, "Upper Layers for Ultra Mobile Broadband (UMB) Air Interface" , August 2007
- cclma2000 Enhanced Packet Data Air Interface System (EPDAI) - System Requirements Document, June 2006.
- C30-20070108-037Rl, "Harmonized Proposal on LBC MIMo" ,January 2007
- C30-20070205-003, "LDpc Coding Proposal for LBC" , February 2007.
- C30-20061030-052, "Group Resource Allocation Components Proposal" , October 2006
- C30-20060327-020, "Air Interface Evolution Framework Proposal" , Huawei, RID, and ZIE, March 2006.
- C30-20060731-016, "Iterative Soft Interference Cancellation (ISIC) for LS-OFDMA: Concept and Simulation Results" .july 2006
- C30-20060327-023, "QUALCOMM Proposal for 3GPP2 Air Interface Evolution Phase 2" , March 2006
- C30-20060116-026," LNS Proposal for Air Interface Evolution Phase 2" , Lucent, Nortel, and Samsung, january 2006
- C30-20060327-014, "Overview of Rotational OFDM Transmission Technology" , KDDI, March 2006
- C30-20060731-029, "Forward Packet Data Control Assignment Channel" , LGE,July 2006
- Qualcomm, "UMB Technology Overview and Roadrnap" , CTIA, CDG, Mar 27,2007.
- Alcatel-Lucent, "UMB and Next Generation Services" , CTIA, CDG, Mar 27, 2007.
- Hitachi, "UMB Application and Service" , CTIA, CDG, Mar 27, 2007
- Huawei, "UMB Performance and Huawei Evolution Strategy" ,CTIA, CDG, Mar 27,2007
- LGE, "Mobile Broadband Devices and UMB" , CTIA, CDG, Mar 27, 2007
- Motorola, "End User Services: On the Road to Ultra Mobile Broadband", CTIA, CDG, Mar 27, 2007
- Nortel, "UMB Deployment Option" , CTIA, CDG, Mar 27,2007
- ZTE, "Ultra Mobile Broadband: New Access Technology for NGMN" , CTIA, CDG, Mar 27, 2007
- C.Rloo2-0 v1.0, "cdma2000 Evaluation Methodology", january 2005
- C30-20060424-049, "VoIP Model for Evaluation Methdology of Phase II Proposals" , April 2007