References
- Acharya, N.K., Lee, Y.D., and Kim, J.K., (2006), 'Conflicting factors in Korean construction industry', Korean journal of construction engineering and management (KICEM), Vol. 7 (2), pp. (In press)
- Ahmed, S. M.; Salman A.; Kappagantula P., and Gollapudi, D., (2003), 'Delays in Construction: A Brief study of the Florida construction industry,' ASC Proceedings of the 39th Annual Conference, Clemson, South Carolina, USA
- Abdul-Rahman, H., Berawi, M.A., Berawi, A.R., Mohamed, O., Othman, M. and Yahya, I.A. (2006), 'Delay mitigation in the Malaysian construction industry', Journal of construction engineering and management, Vol.132 (2), pp. 125-133 https://doi.org/10.1061/(ASCE)0733-9364(2006)132:2(125)
- Aftuck, S.A. (1999), 'Delay claims in construction cases: common pitfalls', Haese, LLC, URL address: http://library. findlaw.com/1999/Aug/1/127109.html )
- Aibinu, A.A. and Jagboro, G.O. (2002), 'The effects of construction delays on project delivery in Nigerian construction industry', International journal of project management, Vol. 20, pp. 593-599 https://doi.org/10.1016/S0263-7863(02)00028-5
- Al-Khalil, M.I. and Ai-Ghafly M.A. (1999), 'Delay in public utility projects in Saudi Arabia', International journal of project management, Vol. 17, No. 2, pp. 101-106 https://doi.org/10.1016/S0263-7863(98)00020-9
- Al-Momani, A.H. (2000), 'Construction delay: a quantitative analysis', International journal of project management, Vol.18, pp. 51-59 https://doi.org/10.1016/S0263-7863(98)00060-X
- Arditi, d. and Pattanakitchamroon, T. (2005), 'Selecting a delay analysis method in resolving construction claims', International journal of project management, Article in press
- Assaf, S.A., Al-Khalil, M. and Al-Hazmi, M. (1995), 'Causes of delay in large building construction projects', Journal of management in engineering, Vol. 11, No. 2, pp. 45-50 https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(45)
- Awakul, P., and Ogunlana, S.O., (2002), 'The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study,' Construction Management and Economics, (T & F Spon), Vol. 20 (4), 365-377 https://doi.org/10.1080/01446190210133456
- Barrie, D.S. and Paulson, B.C. (1992), Professional construction management: including CM, design-construct, and general contracting, (3rd ed.), McGraw-Hill, Inc
- Chevalier, D. (2001), 'Construction delays: Curses and blessings', Cooperative Grocer, No. 96, Sept-Oct. URL address: http://www. cooperativegrocer.coop/articles/index.php?view_all=all_issues
- Coetzee, M. (2005), 'The fairness of affirmative action: an organizational justice perspective,' PhD. Thesis, University of Pretoria, South Africa URL address: http://upetd.up.ac.za/thesis/available/etd-04132005-130646/
- Ellis, R.D. and Thomas, H.R. (2002), 'The root causes of delays in highway construction', 82nd Annual meeting of the transportation research board, Washington DC
- Elinwa, A.U. and Joshua, M. (2001), 'Time-overrun factors in Nigeria construction industry', Journal of construction engineering and management, Vol. 127 (5), pp. 419-425 https://doi.org/10.1061/(ASCE)0733-9364(2001)127:5(419)
- Fereig, S.M. and Kartam, N. (2005), 'Construction delay in international projects: with special reference to the Arabian Gulf area, causes, damage assessments and entitlements', URL address: http://www.pmicos.org/topics /topic%20-%202005-10.pdf
- Foreman, D.E. (1999), 'Delays and extensions of time', URL address http://www.dforeman.com/Delays.html
- Fong, N.K., Wong, L.Y., and Wong, L.T. (2006), 'Fire services installation related contributors of construction delays', Building and Environment, Vol. 41 (2), pp. 211-222 https://doi.org/10.1016/j.buildenv.2005.01.004
- Frimpong, Y. and Oluwoye, J. (2003), 'Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana', Journal of construction research, (World scientific), Vol. 4 (2), pp. 175-187 https://doi.org/10.1142/S1609945103000418
- Gould. F.E. (1997), 'Managing the construction process: estimating, scheduling and project control', (2nd ed.), Prentice Hall
- Kartam, S., (1999), 'Generic methodology for analyzing delay claims', Journal of construction engineering and management, Vol. 125 (6), pp. 409-419 https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(409)
- Koushki, P.A., Al-Rashid, K. and Kartam, N. (2005), 'Delays and cost increases in the construction of private residential projects in Kuwait', Construction management and economics, Vol. 23 (March), pp. 285-294 https://doi.org/10.1080/0144619042000326710
- Kumaraswamy, M.M. and Chan, D.W.M. (1997), 'A comparative study of causes of time overruns in Hong Kong construction projects', International journal of project management, Vol. 15 (1), pp. 55-63 https://doi.org/10.1016/S0263-7863(96)00039-7
- Kumaraswamy, M.M. and Chan, D.W.M. (1998), 'Contributors to construction delays', Construction management and economics, Vol. 16, pp. 17-29 https://doi.org/10.1080/014461998372556
- Long, N.D., Ogunlana, S., Quang, T., and Lam, K.C. (2004), 'Large construction projects in developing countries: a case study from Vietnam,' International Journal of Project Management, (Elsevier), Vol. 22 (7), 553-561 https://doi.org/10.1016/j.ijproman.2004.03.004
- Majid, M.Z. A. and McCaffer, R. (1998), 'Factors of nonexcusable delays that influence contractors' performance', Journal of management in engineering, Vol. 14 (3), pp. 42-49 https://doi.org/10.1061/(ASCE)0742-597X(1998)14:3(42)
- Mansfield, N.R., Ugwu O.O., and Doran, T., (1994), 'Causes of delay and cost overruns in Nigerian construction projects', International Journal of Project Management, Vol. 12 (4), pp. 254-260 https://doi.org/10.1016/0263-7863(94)90050-7
- Nirmal, Lee, Y.D., Kim, S.Y. and Kim, S.M. (2005), 'Delay in building construction projects in developing countries: A case study of Nepal', Journal of the Korean society of maintenance engineers, Vol. 10 (3), pp. 81-95
- Nkado, N. (2005), 'Construction time-influencing factor', URL address: http://www.misronet.com/durations.htm
- Norfleet, D.A., (2004), 'Understanding construction Schedule Delays,' The Investigative Engineer, A Publication of Professional Investigative Engineers (February). URL address: www.callpie. com
- Odeh, A.M., and Battaineh, H.T. (2002), 'Causes of construction delay: traditional contracts', International journal of project management, (Elsevier), Vol.20, pp. 67-73 https://doi.org/10.1016/S0263-7863(00)00037-5
- Ogunlana, S.O., Promkuntong, K., and Jearkjirm, V. (1996), 'Construction delays in a fast growing economy: comparing Thailand with other economies', International journal of project management, Vol.14 (1), pp. 37-45 https://doi.org/10.1016/0263-7863(95)00052-6
- Santoso, D.S., Ogunlana, S.O. and Minato, T. (2003), 'Assessment of risks in high rise building construction in Jakarta', Engineering, construction and Architectural management, (Emerald), Vol. 10 (1), pp. 43-55 https://doi.org/10.1108/09699980310466541
- U.S. Department of Transportation (2003), 'Delays affecting its projects: summary of findings', Federal Highway Administration (USDT), USA, URL address: http://www.its.dot.gov/JPODO CS?REPTS_TE/13949.html
- Williams, T.M., Eden, C.L., Ackermann, F.R., and Tait, A. (1995), 'The effects of design changes and delays on project costs', Journal of the operational research society, Vol. 46 (7), pp. 809-818 https://doi.org/10.1057/jors.1995.114