Investigating delay factors in construction industry: A Korean perspective


Abstract

Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.

Keywords

References

  1. Acharya, N.K., Lee, Y.D., and Kim, J.K., (2006), 'Conflicting factors in Korean construction industry', Korean journal of construction engineering and management (KICEM), Vol. 7 (2), pp. (In press)
  2. Ahmed, S. M.; Salman A.; Kappagantula P., and Gollapudi, D., (2003), 'Delays in Construction: A Brief study of the Florida construction industry,' ASC Proceedings of the 39th Annual Conference, Clemson, South Carolina, USA
  3. Abdul-Rahman, H., Berawi, M.A., Berawi, A.R., Mohamed, O., Othman, M. and Yahya, I.A. (2006), 'Delay mitigation in the Malaysian construction industry', Journal of construction engineering and management, Vol.132 (2), pp. 125-133 https://doi.org/10.1061/(ASCE)0733-9364(2006)132:2(125)
  4. Aftuck, S.A. (1999), 'Delay claims in construction cases: common pitfalls', Haese, LLC, URL address: http://library. findlaw.com/1999/Aug/1/127109.html )
  5. Aibinu, A.A. and Jagboro, G.O. (2002), 'The effects of construction delays on project delivery in Nigerian construction industry', International journal of project management, Vol. 20, pp. 593-599 https://doi.org/10.1016/S0263-7863(02)00028-5
  6. Al-Khalil, M.I. and Ai-Ghafly M.A. (1999), 'Delay in public utility projects in Saudi Arabia', International journal of project management, Vol. 17, No. 2, pp. 101-106 https://doi.org/10.1016/S0263-7863(98)00020-9
  7. Al-Momani, A.H. (2000), 'Construction delay: a quantitative analysis', International journal of project management, Vol.18, pp. 51-59 https://doi.org/10.1016/S0263-7863(98)00060-X
  8. Arditi, d. and Pattanakitchamroon, T. (2005), 'Selecting a delay analysis method in resolving construction claims', International journal of project management, Article in press
  9. Assaf, S.A., Al-Khalil, M. and Al-Hazmi, M. (1995), 'Causes of delay in large building construction projects', Journal of management in engineering, Vol. 11, No. 2, pp. 45-50 https://doi.org/10.1061/(ASCE)0742-597X(1995)11:2(45)
  10. Awakul, P., and Ogunlana, S.O., (2002), 'The effect of attitudinal differences on interface conflicts in large scale construction projects: a case study,' Construction Management and Economics, (T & F Spon), Vol. 20 (4), 365-377 https://doi.org/10.1080/01446190210133456
  11. Barrie, D.S. and Paulson, B.C. (1992), Professional construction management: including CM, design-construct, and general contracting, (3rd ed.), McGraw-Hill, Inc
  12. Chevalier, D. (2001), 'Construction delays: Curses and blessings', Cooperative Grocer, No. 96, Sept-Oct. URL address: http://www. cooperativegrocer.coop/articles/index.php?view_all=all_issues
  13. Coetzee, M. (2005), 'The fairness of affirmative action: an organizational justice perspective,' PhD. Thesis, University of Pretoria, South Africa URL address: http://upetd.up.ac.za/thesis/available/etd-04132005-130646/
  14. Ellis, R.D. and Thomas, H.R. (2002), 'The root causes of delays in highway construction', 82nd Annual meeting of the transportation research board, Washington DC
  15. Elinwa, A.U. and Joshua, M. (2001), 'Time-overrun factors in Nigeria construction industry', Journal of construction engineering and management, Vol. 127 (5), pp. 419-425 https://doi.org/10.1061/(ASCE)0733-9364(2001)127:5(419)
  16. Fereig, S.M. and Kartam, N. (2005), 'Construction delay in international projects: with special reference to the Arabian Gulf area, causes, damage assessments and entitlements', URL address: http://www.pmicos.org/topics /topic%20-%202005-10.pdf
  17. Foreman, D.E. (1999), 'Delays and extensions of time', URL address http://www.dforeman.com/Delays.html
  18. Fong, N.K., Wong, L.Y., and Wong, L.T. (2006), 'Fire services installation related contributors of construction delays', Building and Environment, Vol. 41 (2), pp. 211-222 https://doi.org/10.1016/j.buildenv.2005.01.004
  19. Frimpong, Y. and Oluwoye, J. (2003), 'Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana', Journal of construction research, (World scientific), Vol. 4 (2), pp. 175-187 https://doi.org/10.1142/S1609945103000418
  20. Gould. F.E. (1997), 'Managing the construction process: estimating, scheduling and project control', (2nd ed.), Prentice Hall
  21. Kartam, S., (1999), 'Generic methodology for analyzing delay claims', Journal of construction engineering and management, Vol. 125 (6), pp. 409-419 https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(409)
  22. Koushki, P.A., Al-Rashid, K. and Kartam, N. (2005), 'Delays and cost increases in the construction of private residential projects in Kuwait', Construction management and economics, Vol. 23 (March), pp. 285-294 https://doi.org/10.1080/0144619042000326710
  23. Kumaraswamy, M.M. and Chan, D.W.M. (1997), 'A comparative study of causes of time overruns in Hong Kong construction projects', International journal of project management, Vol. 15 (1), pp. 55-63 https://doi.org/10.1016/S0263-7863(96)00039-7
  24. Kumaraswamy, M.M. and Chan, D.W.M. (1998), 'Contributors to construction delays', Construction management and economics, Vol. 16, pp. 17-29 https://doi.org/10.1080/014461998372556
  25. Long, N.D., Ogunlana, S., Quang, T., and Lam, K.C. (2004), 'Large construction projects in developing countries: a case study from Vietnam,' International Journal of Project Management, (Elsevier), Vol. 22 (7), 553-561 https://doi.org/10.1016/j.ijproman.2004.03.004
  26. Majid, M.Z. A. and McCaffer, R. (1998), 'Factors of nonexcusable delays that influence contractors' performance', Journal of management in engineering, Vol. 14 (3), pp. 42-49 https://doi.org/10.1061/(ASCE)0742-597X(1998)14:3(42)
  27. Mansfield, N.R., Ugwu O.O., and Doran, T., (1994), 'Causes of delay and cost overruns in Nigerian construction projects', International Journal of Project Management, Vol. 12 (4), pp. 254-260 https://doi.org/10.1016/0263-7863(94)90050-7
  28. Nirmal, Lee, Y.D., Kim, S.Y. and Kim, S.M. (2005), 'Delay in building construction projects in developing countries: A case study of Nepal', Journal of the Korean society of maintenance engineers, Vol. 10 (3), pp. 81-95
  29. Nkado, N. (2005), 'Construction time-influencing factor', URL address: http://www.misronet.com/durations.htm
  30. Norfleet, D.A., (2004), 'Understanding construction Schedule Delays,' The Investigative Engineer, A Publication of Professional Investigative Engineers (February). URL address: www.callpie. com
  31. Odeh, A.M., and Battaineh, H.T. (2002), 'Causes of construction delay: traditional contracts', International journal of project management, (Elsevier), Vol.20, pp. 67-73 https://doi.org/10.1016/S0263-7863(00)00037-5
  32. Ogunlana, S.O., Promkuntong, K., and Jearkjirm, V. (1996), 'Construction delays in a fast growing economy: comparing Thailand with other economies', International journal of project management, Vol.14 (1), pp. 37-45 https://doi.org/10.1016/0263-7863(95)00052-6
  33. Santoso, D.S., Ogunlana, S.O. and Minato, T. (2003), 'Assessment of risks in high rise building construction in Jakarta', Engineering, construction and Architectural management, (Emerald), Vol. 10 (1), pp. 43-55 https://doi.org/10.1108/09699980310466541
  34. U.S. Department of Transportation (2003), 'Delays affecting its projects: summary of findings', Federal Highway Administration (USDT), USA, URL address: http://www.its.dot.gov/JPODO CS?REPTS_TE/13949.html
  35. Williams, T.M., Eden, C.L., Ackermann, F.R., and Tait, A. (1995), 'The effects of design changes and delays on project costs', Journal of the operational research society, Vol. 46 (7), pp. 809-818 https://doi.org/10.1057/jors.1995.114