DOI QR코드

DOI QR Code

Comparison of Methods for Calculating Reactive Power Service Charge and Proposing a New Method using Reactive Power Markets

무효전력시장을 이용한 무효전력서비스 요금 산정방법의 비교 및 새로운 방안

  • Published : 2006.06.30

Abstract

As electric power systems have been moving from a vertically integrated structure to a deregulated environment, calculating reactive power service charges is a new challenging theme for market operators. This paper examines various methods for reactive power management adopted in some deregulated foreign and domestic markets and then proposes a new method to calculate reactive power service charges using a reactive power market. The reactive power market is operated based on bids from the generating sources and is settled on uniform prices by running reactive OPF programs after the day-ahead electricity market. The proposed method takes into account recovering not only the costs of installed capacity but also the lost opportunity costs incurred by reducing active power output to increase reactive power production. A numerical sample study is carried out to illustrate the processes and appropriateness of the proposed method.

전력산업이 수직독점적인 구조에서 규제완화의 경쟁체제로 전환됨에 따라 무효전력서비스의 요금산정이 전력시장 운영자에게는 새로운 이슈가 되고 있다. 본 논문은 몇몇의 선진국과 국내에서 채용되는 무효전력서비스에 대한 요금산정방법을 검토하고, 무효전력시장을 이용하는 새로운 요금산정방법을 제안한다. 무효전력시장은 무효전력 발전원이 제시하는 입찰값을 바탕으로 하루전 전력시장 후에 무효전력 최적조류계산을 거쳐 단일가격으로 결정된다. 제안하는 방법은 무효전력 설치용량에 대한 투자비뿐만 아니라 무효전력 생산량을 늘리기 위해 발전기가 줄이게 되는 유효전력에 대한 기회비용을 함께 고려하고 있다. 26모선 모델계통에서의 사례연구를 통하여 제안하는 방법의 효용성을 입증하고 있다.

Keywords

References

  1. A. A. EI-keib, X. Ma, Calculating Short-Run Marginal Costs of Active and Reactive Pover Production, IEEE Trans on Power Systems 12 (1997) 559-565 https://doi.org/10.1109/59.589604
  2. M. C. Caramanis, R. E. Bohn, F. C. Schweppe, The Costs of Wheeling and Optimal Wheeling Rates, IEEE Trans on Power Systems 1 (1986) 63-73 https://doi.org/10.1109/TPWRS.1986.4334845
  3. J. Y. Choi, S. H. Rim, J. K. Park, Optimal Real Time Pricing of Real and Reactive Powers, IEEE Trans on Power Systems 13 (1998) 1226-1231 https://doi.org/10.1109/59.736234
  4. K. Ro, S. Park, A Method to Calculate Charge for Reactive Power Service under Competition of Electric Power Utilities, KIEE Intemational Trans on Power Engineering 11A (2001) 39-44
  5. J. W. Lamont, J. Fu, Cost Analysis of Reactive Power Support, IEEE Trans on Power Systems 14 (1999) 890-898 https://doi.org/10.1109/59.780900
  6. J. B. Gil, T. G. San Roman, J. J. Alba Rios, P. S. Martin, Reactive Power Pricing: A Conceptual Framework for Remuneration and Charging Procedures, IEEE Trans on Power Systems 15 (2000) 483-489 https://doi.org/10.1109/59.867129
  7. Califomia Independent System Operator Corporation Ancillary services requirement protocol, FERC Electricity Tariff (2000)
  8. National Grid Company, An introduction to reactive power: Ancillary Services (1998)
  9. National Grid Company, NGC reactive market report (2000)
  10. Korea Power Exchange, Ancillary Services Agreement-Technical Schedules (2002)