Abstract
The leakage in the water distribution system means both the loss of money and water resource. To minimize the leakage, we introduced the pressure control method using the pressure reducing valve and pump schedule. For the pressure control, the total leakage is needed to divide into each node. In this study, EPANET 2.0 was used to simulate the water networks in two selected blocks after the total leakage was distributed with each node by four ways. The leakage was allocated into each node as water measured by meter, water pressure, water faucets and Lpcd and simulated by EPANET 2.0. Regardless of the leakage distribution ways, there was no significant difference between the measured water and the estimated water pressure. Thus, the leakage distribution way using water pressures estimated by simulation could be recommended. The scenarios controlling the pressure reducing valve and pump were made in two blocks(A and B). $86,713m^3/year$ leakage in the A block and $11,442m^3/year$ in the B block could be reduced as controlling the pressure reducing valve and pump schedule. It was shown that the fifty million won a year can be saved in the A block and 6.8 million won in the B block.