References
- Ahn, J. S., Kwon, I. H and Kim, S. S.(2003), Distribution planning in a multi-echelon inventory model under rolling horizon environment, IE Interfaces, 16(4),441-449
- Axsiher, S.(2000), Inventory control, Kluwer Academic Publishers, Boston
- Baker, K. R and Scudder, G. D.(1990), Sequencing with earliness and tardiness penalties: A review, Operations Research, 38(1), 22-36 https://doi.org/10.1287/opre.38.1.22
- Bessler, A. A. and Veinott, A. F.(1966), Optimal policy for a dynamic multi-echelon inventory model, Naval Research Logistics Quarterly, 13(4), 355-390 https://doi.org/10.1002/nav.3800130402
- Callarman, T. F. and Whybark, D. C.(1981), Determining purchase quantities for MRP requirements, Journal of Purchasing and Materials Management, 17(3),25-30 https://doi.org/10.1111/j.1745-493X.1981.tb00035.x
- Chopra, S. and Meindl, P.(2003), Supply chain management: strategy, planning, and operation, Prentice Hall, Upper Saddle River, New Jersey
- Clark, A.J. and Scarf, H(1960), Optimal policies for a multi-echelon inventory problem, Management Science, 6(4), 475-490 https://doi.org/10.1287/mnsc.6.4.475
- Evans, R(1967), Inventory control of a multi-product system with a limited production resource, Naval Research Uigistics Quarterly, 14(2), 173-184 https://doi.org/10.1002/nav.3800140205
- Federgruen, A and Zipkin, P. H.(1986a), An inventory model with limited production capacity and uncertain demands I. The average-cost criterion, Mathematics of Operations Research, 11(2), 193-207 https://doi.org/10.1287/moor.11.2.193
- Federgruen, A and Zipkin, P. H.(1986b), An inventory model with limited production capaciry and uncertain demands II. The discounted-cost criterion, Mathematics of Operations Research, 11(2),208-215 https://doi.org/10.1287/moor.11.2.208
- Forrester,J . W.(1961), Industrial dynamics, MIT Press, Cambridge, MA
- Glover, F. and Laguna, M.(997), Tabu search, Kluwer Academic Publishers, Boston
- Ha, Y. A(2001), Supplier-buyer contracting: Asymmetric cost information and cutoff level policy for buyer participation, Naval Research Logistics, 48(1),41-64 https://doi.org/10.1002/1520-6750(200102)48:1<41::AID-NAV3>3.0.CO;2-M
- Karimi, B., Fatemi Ghomi, S. M. T. and Wilson,J. M.(2003), The capacitated lot sizing problem: A review of models and algorithms, Omega, 31(5), 365-378 https://doi.org/10.1016/S0305-0483(03)00059-8
- Koulamas, C. (1996), Single-machine scheduling with time windows and earliness/tardiness penalties, European Journal of Operational Research, 91, 190-202 https://doi.org/10.1016/0377-2217(95)00116-6
- Kwon, I. H, Baek, J. K. and Kim, S. S.(2005), Distribution planning for capacitated supply chains using tabu search approach, IE Interfaces, 18(1), 63-72
- Lee, H. L., So, K. C. and Tang, C. S.(2000), The value of information sharing in a two-level supply chain, Management Science, 46(5), 626-643 https://doi.org/10.1287/mnsc.46.5.626.12047
- Li, G.(1997), Single machine earliness and tardiness scheduling, European Journal of Operational Research, 96(3), 546-558 https://doi.org/10.1016/S0377-2217(96)00062-8
- Poirier,C., Reiter, C. and Stephen, R.(1996), Supply chain optimization, Berrett-Koehlern
- Sea, Y, Jung, S. and HaIun, J.(2002), Optimal reorder decision utilizing centralized stock information in a two-echelon distribution system, Computers &Operatiom Research, 29(2),171-193
- Sox, C., Thomas, L.J and McClain,J.O.(1997), Coordinating production and inventory to improve service, Management Science, 43(9), 1189-1197 https://doi.org/10.1287/mnsc.43.9.1189
- Taft, E. W.(1918), Formulas for exact and approximate evaluation-handling cost of jigs and interest charges of product manufactured included, Iron Age, 101, 1410-1412
- Tsay, A. A, Nahmias, S. and Agrawal, N.(1999), Modeling supply chain contracts: A review, Tayur, S., Ganeshan, R and Magazine, M., eds. Quantitative models for supply chain management, Kluwer Academic Publisher, Boston,MA
- Vollmann, T. E., Berry, W.L., Whybark, D. C. and Jacobs, F. R.(2004), Manufacturing planning and control for supply chain management, McGraw Hill