References
- Ahn, K. I. and Kim, S. J. (2003), A New Interestingness Measure in Association Rules Mining, Journal of the Korean Institute of Industrial Engineers, 29(1), 41-48
- Back, D. H. and Nam, J. K(2002), The Semiconductor Yield Improve System using Data Mining, 2002 IE & MS Spring Conference Papers, 293-300
- Berry, J. and Linoff, G.(1997), Data Mining Technique: For Marketing, Sales, and Customer Support, John Wiley & Sons
- Chun, S. H. and Ock, Y. S.(2003), Development of DBR Scheduling System in Make-to-Order manufacturing environment, 2003 IE & MS Spring Conference Papers, 445-449
- Henry, L. C. and Kingsman, B. G.(1989), Production planning systems and their applicability to make-to-order companies, European Journal of Operations Research, 40(1), 1-15 https://doi.org/10.1016/0377-2217(89)90266-X
- Je, M. K and Ock, Y. S.(2003), Development of scheduling system under Make-to-Order Environments: Ship equipment and marine machinery company, 2003 IE & MS Spring Conference Papers, 430-434
- Jeong, J. W., Kang, B. Y., and Kim, S. Y(2001), A Study on the Development of Evaluation System for the Second-handed Middle & Small Ship, Bulletin of the Society Naval Anhiteasof Korea, 55-58
- Jhee, W. C. and Suh, M. S.(1998), DSS Architectures to Support Data Mining Activities for Supply Chain Management, Journal of MIS Research, 8(3), 51-73
- Kim, J. R. and Lee, Y. L.(2002), Development of an Automated Construction Cost Estimating System for Computer Integrated Construction(CIS) System, Journal of Civil Engineering, 159-169
- Kim, K. H, Shin, K. T., and Park, J. W.(2003), Cost-Estimation Support System for Injection Mold Using QFD(Qualiry Function Deployment) and AI Methods, 2003 IE & MS Spring Conference Papers, 948-957
- Koh, J. M., Seo, J. Y.(2002), A study of contents management in the B2B of Make-to-order, Information System Research, 11(1), 129-149
- Lee, Y. H., Kim, S. S., and Bae, H. J.(1996), Case of Study Automatic Warehouse Optimized Design and Automatic Estimation Support System, Industrial Engineering Magazine, 3(1), 31-37
- Oh, K. M. and Park, C. K.(2005), Process Planning Method under Make-to Order Production System using Data Mining, IE Interfaces, 18(2), 148-157
- Park, C. G. and Song, J. S.(1998), Delivery Date Decision Support System for the Large Scale Make-to-Order Manufacturing Companies: An Electric Motor Company Case, IE Interfaces, 11(3), 181-191
- Yeh, C. H.(2000), A customer-focused planning approach to make-to-order production, Industrial Management & Data System, 100(4), 80-187