Abstract
In this study, dynamic characteristics of water hammer pressure in water supply piping system with water hammer arrester has been investigated experimentally to characterize the transient pressure of water hammer in high rise building. Experiments were conducted to verify the absorption effects by water hammer arresters with 3 different gas volumes of water hammer pressure generated by sudden valve closure. As the results, it has been found that zoning and sizing of pipe diameter for suitable flow velocity and water hammer arresters with effective pressure absorption capacity have to be installed to protect water hammer problems in building water supply piping system.