Seepage Behavior of Sea Dyke Final Closure with Installation of Bottom Protection Filter Mat

근고공 필터매트 설치에 따른 방조제 끝막이구간의 침투거동

  • Oh, Young-In (Agricultural Eng. Div. Rural Research Institute, KRC) ;
  • Yoo, Jeon-Yong (Agricultural Eng. Div. Rural Research Institute, KRC) ;
  • Kim, Hyun-Tae (Agricultural Eng. Div. Rural Research Institute, KRC)
  • 오영인 (한국농촌공사 농어촌연구원 농공기술연구실) ;
  • 유전용 (한국농촌공사 농어촌연구원 농공기술연구실) ;
  • 김현태 (한국농촌공사 농어촌연구원 농공기술연구실)
  • Received : 2006.02.19
  • Accepted : 2006.03.16
  • Published : 2006.03.30

Abstract

Sea dyke construction is simply defined as a cutting procedure of sea water flow. Sea dyke construction is more difficult than in-land construction because it is placed on deep seabed and exposed sea wave attack. Especially, the final closure of sea dyke is most dangerous due to the fast velocity of tidal flow. The final closure is consisted with vast rubble and heavy stone gabion, therefore the discharge velocity at land side of final close section is irregularly and sometime occur the fast discharge velocity. In this paper, the seepage model test performed to evaluate seepage behavior of final closure and continuous sea dyke section such as discharge velocity, hydraulic gradient, and phreatic line with installation of bottom protection filter mat. Based on the seepage model test results, the maximum discharge velocity of final closure section is 1.7m/sec and the discharge velocity is decreased maximum 23.7% with installation of bottom protection filter mat.

방조제 공사는 바다를 막아 바닷물의 흐름을 차단해가는 과정으로 육상공사와는 달리 수심이 깊고 파랑이 심한 바다에서 이루어지는 공사이기 때문에 축조재료의 유실이 많고 심할 경우 방조제가 붕괴되는 위험이 큰 공사이다. 특히, 방조제의 끝막이 단면은 대규모 사석과 돌망태 등을 이용하여 시공하므로, 구성 재료가 불규칙하고 간극이 크기 때문에 일반적인 지반내의 침투흐름보다 상당히 빠른 침투가 발생된다. 본 연구에서는 방조제 끝막이 후 축조된 사석단면과 후속공정을 통하여 축조되는 방조제단면에 대한 실내 침투모형시험을 수행하여 침투거동을 예측 및 분석하였다. 다양한 조위변화를 재현하여 근고공 필터매트 시공에 따른 사석단면내의 유속변화, 침윤선 분포 등을 계측하여 침투거동을 분석하였다. 실내 침투모형시험 결과, 끝막이 사석단면의 침투유속은 최대 1.7m/sec 발생하였으며, 근고공 필터매트 시공에 따라 최대 침투유속이 23.7% 감소하였다.