An Experimental Study on the Displacement of Suspension Element for High Speed Rolling-stock

고속철도차량 현가요소 운동변위에 대한 실험적 연구

  • 김형진 (한국철도기술연구원, 철도시스템안전연구본부) ;
  • 유원희 (한국철도기술연구원, 철도시스템안전연구본부) ;
  • 박태원 (아주대학교 기계공학과) ;
  • 허현무 (한국철도기술연구원, 철도시스템안전연구본부)
  • Published : 2006.12.30

Abstract

The suspension elements like primary coil spring, yaw damper, body to body damper are core parts of high speed railway bogie and the faults relating to these elements are reported recently. Thus, this study is started to analyze the displacements characteristics of suspension elements of high speed railway rolling-stock for the purpose of preventing the faults and developing the maintenance technology for suspension elements like spring and dampers. For this purpose, we made a plan to measure the displacements of the primary coil spring, yaw damper and body to body damper in actual running condition. We developed the measurement device to measure the longitudinal displacement and angular displacement of suspension elements and installed this device to test suspension elements. Test to measure displacements of suspension elements is conducted in service line of high speed railway. The displacement data which is acquired from the test with actual vehicles was analyzed for its maximum displacement depending on the track sections. As a result of analysis, we obtained the displacement trends occurring with the sections and valuable results like maximum values and the displacement distribution.

Keywords

References

  1. Korea TGV Consortium (1996), 'Technical Specifica -tion for Supply of The Carbody to Carbody Dampers'
  2. Korea TGV Consortium (1996), 'Calculation Note : Carrying Bogie Suspensions'
  3. Korea TGV Consortium (1996), 'Calculation Note : Motorized Trailer Motor Bogie Suspensions'
  4. 대원강업(1998), '현가장치개발 2차년도보고서', 건설교통부, pp.15-88