Abstract
The cost estimation of software is getting more important as the portion of software is increasing in acquiring weapon systems. However, the cost estimation of embedded software in a weapon system follows the cost estimation method for general purpose softwares and uses the PRICE S model as a tool. However, any validation result of the estimated cost through an evaluated software size is not well known. Hence, we propose an approach to estimate the cost through evaluating the embedded software site in weapon systems. In order to achieve our research goal, we evaluate the software size of using the line of codes and function points which are produced by the PRICE S model. Finally, we compare the estimated cost data the actual cost data provided by the production company. As a result, we propose an approach to estimate the size and the cost of embedded software in weapon systems which are not easy to estimate objectively. We also expect that the Proposed approach is used for the cost validation and negotiation in the acquisition of weapon systems in the future.
무기체계 획득 사업에 있어서 소프트웨어의 비중이 높아감에 따라 비용추정의 중요성이 증대되고 있으나, 무기체계 내장형 소프트웨어의 비용에 대한 추정은 일반 소프트웨어 비용 추정 방법을 따르며 주로 PRICE S 모델을 도구로 사용하고 있다. 그렇지만, PRICE S 모델에서 내장형 소프트웨어에 대한 개발규모 산정에 따른 추정 비용의 타당성에 대한 검증 결과는 알려져 있지 않다. 따라서 본 연구에서는 PRICE S 모델을 이용하여 무기체계 내장형 소프트웨어의 산정 규모를 통한 비용 추정 기법을 제안한다. 이를 위하여 PRICE S 모델의 규모 산정 도구를 이용하여 코드라인과 기능점수 방식으로 소프트웨어의 규모를 추정한다. 최종적으로는 제작사에서 제공하는 실제 비용 자료와 비교한다. 결과적으로 객관적으로 추정이 어려웠던 무기체계 내장형 소프트웨어의 규모 및 비용을 추정하는 방안을 제시함으로써, 앞으로 무기체계 획득 사업에서 소프트웨어의 비용 검증 및 협상에 활용할 수 있을 것이다.