한국환경복원기술학회지 (Journal of the Korean Society of Environmental Restoration Technology)
- 제8권1호
- /
- Pages.45-51
- /
- 2005
- /
- 1229-3032(pISSN)
- /
- 2733-5011(eISSN)
분뇨처리장 방류수를 정화하는 부들습지의 초기운영 단계에서 총인의 제거
Total Phosphorus Removal in Cattail Wetland Purifying Effluent from a Night Soil Treatment Plant during Its Initial Operation
- 양홍모 (전남대학교 조경학과)
- Yang, Hongmo (Dept. of Landscape Architecture, Chonnam National University)
- 투고 : 2004.11.15
- 발행 : 2005.02.28
초록
Total phosphorus(TP) removal was examined in a surface-flow wetland constructed in April 2003 during its initial operating stage from June to November 2003. Its dimensions were 87mL by 14mW. It was a part of a four-wetland-cell treatment system constructed near the Kohung Estuarine Lake located in the southern part of Korea. Effluent from a night soil treatment plant was discharged into the wetland and purified effluent from the wetland was discharged into Sinyang Stream flowing into the Lake. Cattails(Typha angustifolia ) from natural wetlands were cut at about 40 cm height and transplanted into the wetland. An average of 25.0