A Study on the Transition & Expectation through Survey for Existing Building and Engineer's Opinion

기존 사무소 건물 및 설비전문가 조사를 통한 설비시스템의 변화와 전망에 대한 연구

  • Published : 2005.06.30

Abstract

This study is the survey of a transition procedure of building services systems(heat source, HVAC, water supply) through the survey of existing office buildings, building design documents. The preference & major consideration of system selection is the engineer's opinions. The results of this survey can be used in selection of building services system design. In this survey, "Hot & cold water generator system" and "single duct CAV+FCU system", "Elevated water tank system" are selected. The most important consideration in system selection is the energy saving in heat source system, and comfort in HVAC system, and water pressure in water supply system. They prefer "steam boiler+absorption chiller system" for heat source system, "steam boiler+ice thermal storage system", "hot & cold water generator system", "district heating+absorption chiller system" : "single duct CAV+FCU system" and "single duct VAV+convector system" for HVAC system: and "booster pump system" for water supply system.

Keywords

References

  1. 최신공기조화설비 김영호;박정운
  2. 공기조화.냉동.위생공학편람, 제2권 공기조화편 공기조화냉동공학회
  3. 건물의 냉열원 설비시스템의 에너지 절약 설계조건 평가, 대한건축학회논문 삼신설계주식회사, 설계도면(1980~2000년) 김용식